Difference between revisions of "PePPO 2011Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 7: Line 7:
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.
 +
 +
 +
October 2011 || Finish Work in Injector area for PePPO
 +
 +
September 2011 || Beam Line installed
 +
 +
August 2011 || vacuum pumps ready, Compton Polarimeter Table installed
  
 
=Region 3  =
 
=Region 3  =

Revision as of 14:16, 28 April 2011

PePPO run

Currently scheduled Injector recovery on October 22

Positrons May be November 4 & 5


Currently max energy is 7.8 MeV.


October 2011 || Finish Work in Injector area for PePPO

September 2011 || Beam Line installed

August 2011 || vacuum pumps ready, Compton Polarimeter Table installed

Region 3

Cable length are 75-100 feet long

2 NaI detectors

one has mirror between it and the port window to reflect light to a camera.


See if we can send out one of our actuators to move the mirror in and out.

PePPo NaI Setup.png