Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
Currently max energy is 7.8 MeV. | Currently max energy is 7.8 MeV. | ||
+ | |||
+ | |||
+ | October 2011 || Finish Work in Injector area for PePPO | ||
+ | |||
+ | September 2011 || Beam Line installed | ||
+ | |||
+ | August 2011 || vacuum pumps ready, Compton Polarimeter Table installed | ||
=Region 3 = | =Region 3 = |
Revision as of 14:16, 28 April 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
October 2011 || Finish Work in Injector area for PePPO
September 2011 || Beam Line installed
August 2011 || vacuum pumps ready, Compton Polarimeter Table installed
Region 3
Cable length are 75-100 feet long
2 NaI detectors
one has mirror between it and the port window to reflect light to a camera.
See if we can send out one of our actuators to move the mirror in and out.