Difference between revisions of "PePPO 2011Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
  
 
one has mirror between it and the port window to reflect light to a camera.
 
one has mirror between it and the port window to reflect light to a camera.
 +
 +
 +
See if we can send oiut one of our actuators to move the mirror in and out.

Revision as of 16:42, 27 April 2011

PePPO run

Currently scheduled Injector recovery on October 22

Positrons May be November 4 & 5


Currently max energy is 7.8 MeV.

Region 3

Cable length are 75-100 feet long

2 NaI detectors

one has mirror between it and the port window to reflect light to a camera.


See if we can send oiut one of our actuators to move the mirror in and out.