Difference between revisions of "PePPO 2011Run"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=PePPO run = | =PePPO run = | ||
− | |||
− | + | Currently scheduled Injector recovery on October 22 | |
+ | |||
+ | Positrons May be November 4 & 5 | ||
+ | |||
+ | |||
+ | Currently max energy is 7.8 MeV. | ||
=Region 3 = | =Region 3 = | ||
Cable length are 75-100 feet long | Cable length are 75-100 feet long |
Revision as of 13:00, 27 April 2011
PePPO run
Currently scheduled Injector recovery on October 22
Positrons May be November 4 & 5
Currently max energy is 7.8 MeV.
Region 3
Cable length are 75-100 feet long