Difference between revisions of "Beamline Drawing 2011 J.Ellis"
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
|- | |- | ||
|G1|| Fast Gate Valve || 0.000 m || | |G1|| Fast Gate Valve || 0.000 m || | ||
+ | |- | ||
+ | |T1||Torroid 1 || || | ||
|- | |- | ||
|STXY1|| X-Y steerers 1 || || | |STXY1|| X-Y steerers 1 || || | ||
Line 51: | Line 53: | ||
|- | |- | ||
|Q10 || Quad ||5.143 m || | |Q10 || Quad ||5.143 m || | ||
+ | |- | ||
+ | |T2 || Torroid 2 || || | ||
|- | |- | ||
|F3 || Third Flag || 5.712 m || | |F3 || Third Flag || 5.712 m || |
Revision as of 15:28, 24 March 2011
Below is the Beamline sketch
Label | Beam Line Element | Z location from Gate Valve | Dimensions of Element |
G1 | Fast Gate Valve | 0.000 m | |
T1 | Torroid 1 | ||
STXY1 | X-Y steerers 1 | ||
Q1 | First Quad | 0.175 m | |
Q2 | Second Quad | 0.425 m | |
Q3 | Third Quad | 0.675 m | |
STXY2 | X-Y steerers 2 | ||
Targ1 | positron production target | 1.175 m | |
Q4 | Fourth Quad | 1.400 m | |
Q5 | Fifth Quad | 1.650 m | |
Q6 | Sixth Quad | 1.8 | |
STXY3 | X-Y steerers 3 | ||
F1 | OTR Flag | ||
FC1 | Faraday Cup 1 | ||
D1 | First Kiwi Dipole | 2.525 m | |
S1 | Energy Slits | 2.851 m | |
STXY4 | X-Y steerers 4 | ||
Q7 | Seventh Quad | 3.026 m | |
F1 | Yag SCREEN | 3.296 m | |
D2 | Second Kiwi Dipole | 3.617 m | |
Q8 | Eigth Quad | 4.063 m | |
STXY5 | X-Y steerers 5 | ||
Q9 | Quad | 4.603 m | |
Q10 | Quad | 5.143 m | |
T2 | Torroid 2 | ||
F3 | Third Flag | 5.712 m | |
Targ2 | Brehm target ladder | 6.112 m | |
HOLE@WALL | 6.412 m |