Difference between revisions of "IAC LeadFlourideCherenkovCrystalTests 5-09"
(→Day 3) |
(→Day 4) |
||
(11 intermediate revisions by the same user not shown) | |||
Line 87: | Line 87: | ||
------------------------------------------------------------------------------------------------------------------------------------------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------- | ||
− | 3) Irradiation batch 1:4 old | + | 3) Irradiation batch 1:4 old blocks -Blocks 15, 27, 109 and 89. Here is the transmission before irradiation: |
− | [[Image:B15averagebeforeexp.jpg | 200 px]] [[Image:B39averagebeforeexp.jpg | 200 px]] [[Image:B109averagebeforeexp.jpg | 200 px]] | + | [[Image:B15averagebeforeexp.jpg | 200 px]] [[Image:B39averagebeforeexp.jpg | 200 px]] [[Image:B109averagebeforeexp.jpg | 200 px]][[Image:B27averagemay11beforeexp.jpg | 200 px]] |
;Accelerator Settings | ;Accelerator Settings | ||
Line 111: | Line 111: | ||
Blocks 200, 201, 202, 203. | Blocks 200, 201, 202, 203. | ||
+ | |||
+ | Here is the transmission before irradiation - | ||
+ | |||
+ | [[Image:B200averagebeforeexp.jpg | 200 px]] [[Image:B201averagebeforeexp.jpg | 200 px]] [[Image:B202averagebeforeexp.jpg | 200 px]] [[Image:B203averagebeforeexp.jpg | 200 px]] | ||
Beam on: 9:15 AM | Beam on: 9:15 AM | ||
Line 243: | Line 247: | ||
Oscope data: C:\My Computer\Current Normalization Data\_2-Ch1-1106.dat -3068.dat | Oscope data: C:\My Computer\Current Normalization Data\_2-Ch1-1106.dat -3068.dat | ||
+ | |||
+ | 6) Bleach blocks 208 - 215 3:15 | ||
+ | 7) Bleach blocks 89, 15, 27, 109 4:25 | ||
+ | 8) Bleach blocks 200-203 5:35 PM | ||
== Day 4 == | == Day 4 == | ||
− | + | 1) Irradiate silicon detector at z = 16 cm | |
− | + | ||
− | + | ;Accelerator Settings | |
+ | {| border="1" | ||
+ | | beam energy || 20 MeV | ||
+ | |- | ||
+ | | Rep Rate: || 100 Hz | ||
+ | |- | ||
+ | | I_peak: || 111 mA/pulse | ||
+ | |- | ||
+ | | pulse width:|| 0.1 <math>\mu</math>s (100 ns) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | o Beam on 8:30 AM | ||
+ | o Beam off 11:00 AM | ||
+ | |||
+ | 2) Irradiate 4 blocks. 200, 201, 208, 211. | ||
+ | |||
+ | ;Accelerator Settings | ||
+ | {| border="1" | ||
+ | | beam energy || 20 MeV | ||
+ | |- | ||
+ | | Rep Rate: || 100 Hz | ||
+ | |- | ||
+ | | I_peak: || 111 mA/pulse | ||
+ | |- | ||
+ | | pulse width:|| 0.1 <math>\mu</math>s (100 ns) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | o Beam on 11:10 AM | ||
+ | |||
+ | o Beam off 2:20 PM | ||
+ | |||
+ | Count: 1159068. | ||
+ | |||
+ | O-scope data: C:\My Computer\Current Normalization Data|20090514\_2-Ch1-3742.dat - _2-Ch1-3761.dat | ||
+ | |||
+ | 3) Irradiate four blocks. 216, 217, 218, 219. | ||
+ | |||
+ | ;Accelerator Settings | ||
+ | {| border="1" | ||
+ | | beam energy || 20 MeV | ||
+ | |- | ||
+ | | Rep Rate: || 100 Hz | ||
+ | |- | ||
+ | | I_peak: || 111 mA/pulse | ||
+ | |- | ||
+ | | pulse width:|| 0.1 <math>\mu</math>s (100 ns) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | o Beam on 2:29 PM. | ||
+ | |||
+ | o Beam off 5:01 PM | ||
+ | |||
+ | Count: 909618 | ||
+ | |||
+ | O-scope data: C:\My Computer\Current Normalization Data\20090514\_2-Ch1-3762.dat -_2-Ch1-3791.dat | ||
== Day 5 == | == Day 5 == | ||
− | + | 1) Irradiate four blocks. 200, 201, 209, 210. | |
− | + | ||
− | + | ;Accelerator Settings | |
+ | {| border="1" | ||
+ | | beam energy || 20 MeV | ||
+ | |- | ||
+ | | Rep Rate: || 100 Hz | ||
+ | |- | ||
+ | | I_peak: || 111 mA/pulse | ||
+ | |- | ||
+ | | pulse width:|| 0.1 <math>\mu</math>s (100 ns) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | o Beam on 7:30 AM | ||
+ | |||
+ | o Beam off 10:20 AM | ||
+ | |||
+ | O-scope data: C:\My Computer\Current Normalization Data\20090515\_2-Ch1-3937.dat - 3983.dat | ||
+ | |||
+ | 2) Irradiate 212, 213, 214, 215. | ||
+ | |||
+ | ;Accelerator Settings | ||
+ | {| border="1" | ||
+ | | beam energy || 20 MeV | ||
+ | |- | ||
+ | | Rep Rate: || 100 Hz | ||
+ | |- | ||
+ | | I_peak: || 111 mA/pulse | ||
+ | |- | ||
+ | | pulse width:|| 0.1 <math>\mu</math>s (100 ns) | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | o Beam on 11:10 AM | ||
=5/11/09= | =5/11/09= |
Latest revision as of 17:44, 15 May 2009
http://clasweb.jlab.org/wiki/index.php/Hall_A_IAC_Tests
Previous Tests: IAC_LeadFlourideCherenkovCrystalTests
Run Plan
Summary
Task | Time Budget |
Beam setup | 0.5 days |
Testing 20 new blocks | 2.5 days |
Silicon test | 1.0 day |
Bleaching/Re-irradiation test | 0.5-1 day |
Testing old blocks | 12 blocks/day |
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 30 Hz |
I_peak: | 60 mA/pulse |
pulse width: | 0.1 | s (100 ns)
Day 0
Experiment Set-up Tasks:
1) Translator table -positioned in front of 0 degree exit port and manual operation (50,000/inch).
2) Faraday Cup - positioned at z = 30 cm, clipped (alligator to BNC & grounded), connected to cable C6, terminated into Channel 1 on the scope.
3) Green pick-up loop -Sits freely atop poly blocks in front of exit window with poly spacers between loop and exit window to prevent grounding, connected to cable C7, terminated into channel 3 (?) on scope (re-check this on morning of Day 1).
4) Fluke multimeter & camera set-up for real-time temperature monitoring - camera positioned and focused, connected via cable C5 to DAQ monitor.
5) Glass plate -unable to locate small size plate on Day 0, will look again morning of Day 1. Beam spot size measurement not crucial given properly operating beam scan software.
6) Beam scan -Brian is troubleshooting this software, will show Adrianne how to use the morning of Day 1.
Day 1
Beam setup & 2-3 hours
11:25 AM -
12:00 PM -
1) Shoot glass plate at 30cm from exit port
2) Temperature test with 1 old block
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
23 deg C at start 33 max at finish -1 hour 40 min beam on.
Total count on Ortec counter -361931
Oscope data: C:\My Computer\Current Normalization\20090511\pbf2irradtemprun-Ch1-003.dat - pbf2irradtemprun-int.meas
3) Irradiation batch 1:4 old blocks -Blocks 15, 27, 109 and 89. Here is the transmission before irradiation:
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
2.5 hours beam on.
O-scope data: C:\My Computer\Current Normalization\20090511\pbf2irrad1strunday1_1-Ch1.meas-9999.dat
Day 2
1) Irradiation batch 2:4 new blocks
Blocks 200, 201, 202, 203.
Here is the transmission before irradiation -
Beam on: 9:15 AM
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam off at 1:00 PM.
o Pulse count: 1412543
o Block 100 will be used as a reference for transmission measurements for the rest of the week. Here is its transmission:
o O-scope data: C:\My Computer\Current Normalization Data\20090512\_2-Ch1-0001.dat-_2-Ch1-0843.dat
2) Irradiation batch 1 (Blocks 15, 27, 109 and 89) removed from hall (7:45 AM) and transmission measured.
Translator table origin @ exit window:
Axis 1 - 0 (beamline)
Axis 2 - -14925 (Horizontal)
Axis 3 - -111750 (Vertical)
3) Irradiation batch 3:4 new blocks -Blocks 204, 205, 206, 207.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 1:09 PM
o 2:19 PM -no optical bleach yet. Block 89 shows gains in transmission after 2.5 hour irradiation.
o Beam off at 2:23 PM
Pulse count: 455378.
O-scope data: C:\My Computer\Current Normalization Data\20090512\_2-Ch1-0845.dat-0853.dat
o Beam on 2:28 PM
o Beam off 5:00 PM
Pulse count: 1379080
O-scope data: C:\My Computer\Current Normalization Data\20090512\_2-Ch1-0854.dat -0862.dat
4) Bleach blocks 200, 201, 202, 203 5:15 PM.
Transmission Measurements:
Day 3
1) Irradiate blocks 208, 209, 210, 211 (new blocks)
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 7:00 AM
o Beam off 10:30 AM
Count: 1144922 Pulses.
2) Irradiate new blocks 212, 213, 214, 215.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 10:40
o Beam off 11:30 -Suspicion of misaligned beam.
3) Beam scan 12:35 PM
O-scope data: C:\My Computer\Current Normalization Data\20090513\_2-Ch1-0863.dat - _2-Ch1-1105.dat
o Beam back on 1:10 PM
4) Remove blocks 200, 201, 202, 203 from blue light. 11:00 AM.
5) Bleach blocks 204, 405, 206, 207 8:55 AM.
o 1:46 PM -Green Pick-up Loop was not tracking before this time. Was previously set to 1 M-ohm input as well. Is now on 50-ohm. O-scope online & recording pulse data. Invert off.
o Beam off 5:05 PM
Count: 1057765.
Oscope data: C:\My Computer\Current Normalization Data\_2-Ch1-1106.dat -3068.dat
6) Bleach blocks 208 - 215 3:15 7) Bleach blocks 89, 15, 27, 109 4:25 8) Bleach blocks 200-203 5:35 PM
Day 4
1) Irradiate silicon detector at z = 16 cm
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 8:30 AM o Beam off 11:00 AM
2) Irradiate 4 blocks. 200, 201, 208, 211.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 11:10 AM
o Beam off 2:20 PM
Count: 1159068.
O-scope data: C:\My Computer\Current Normalization Data|20090514\_2-Ch1-3742.dat - _2-Ch1-3761.dat
3) Irradiate four blocks. 216, 217, 218, 219.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 2:29 PM.
o Beam off 5:01 PM
Count: 909618
O-scope data: C:\My Computer\Current Normalization Data\20090514\_2-Ch1-3762.dat -_2-Ch1-3791.dat
Day 5
1) Irradiate four blocks. 200, 201, 209, 210.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 7:30 AM
o Beam off 10:20 AM
O-scope data: C:\My Computer\Current Normalization Data\20090515\_2-Ch1-3937.dat - 3983.dat
2) Irradiate 212, 213, 214, 215.
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 100 Hz |
I_peak: | 111 mA/pulse |
pulse width: | 0.1 | s (100 ns)
o Beam on 11:10 AM