Difference between revisions of "IAC LeadFlourideCherenkovCrystalTests 5-09"
(→Day 3) |
(→Day 1) |
||
Line 36: | Line 36: | ||
== Day 1== | == Day 1== | ||
− | |||
− | |||
− | |||
Beam setup & 2-3 hours\\ | Beam setup & 2-3 hours\\ | ||
Line 45: | Line 42: | ||
Bleaching of batch \#2:&29 hours\\ | Bleaching of batch \#2:&29 hours\\ | ||
Irradiation batch \#3:&4 new blocks\\ | Irradiation batch \#3:&4 new blocks\\ | ||
− | |||
== Day 2== | == Day 2== |
Revision as of 16:14, 28 April 2009
http://clasweb.jlab.org/wiki/index.php/Hall_A_IAC_Tests
Previous Tests: IAC_LeadFlourideCherenkovCrystalTests
Run Plan
Summary
Task | Time Budget |
Beam setup | 0.5 days |
Testing 20 new blocks | 2.5 days |
Silicon test | 1.0 day |
Bleaching/Re-irradiation test | 0.5-1 day |
Testing old blocks | 12 blocks/day |
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 30 Hz |
I_peak: | 60 mA/pulse |
pulse width: | 0.1 | s (100 ns)
Day 1
Beam setup & 2-3 hours\\ Irradiation batch \#1:&3 new blocks + 1 old ``reference block\\ Irradiation {\bf batch \#2}:&4 new blocks\\ Bleaching of batch \#2:&29 hours\\ Irradiation batch \#3:&4 new blocks\\
Day 2
Irradiation batch \#4:&4 new blocks\\ Irradiation batch \#5:&4 new blocks\\ Irradiation {\bf batch \#2}:&4 new blocks\\ Bleaching of batch \#2:&24 hours\\
Day 3
- Accelerator Settings
beam energy | 20 MeV |
Rep Rate: | 30 Hz |
I_peak: | 60 mA/pulse |
pulse width: | 0.1 | s (100 ns)
\multicolumn{2}{l}{Silicon test}\\ Irradiation {\bf batch \#2}\\ Bleaching of batch \#2:&38 hours\\ =
Day 4
Irradiation batch \#6:&4 new blocks\\ Irradiation batch \#7:&4 new blocks\\ Irradiation batch \#8:&4 new blocks\\
Day 5
Irradiation {\bf batch \#2}\\ \multicolumn{2}{l}{Silicon test}\\ Day 6 -- Bleaching of batch \#2:&24h\\