Difference between revisions of "Finding the Space Between Lead Shots"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 13: Line 13:
 
m <sub>Pb</sub> = m <sub>2</sub> - m <sub>1</sub>
 
m <sub>Pb</sub> = m <sub>2</sub> - m <sub>1</sub>
  
V <sub>Pb</sub> = m <sub>2</sub> - m <sub>1</sub> / ρ <sub>Pb</sub>
+
V <sub>Pb</sub> = (m <sub>2</sub> - m <sub>1</sub>) / ρ <sub>Pb</sub>
  
  
 
m <sub>H <sub>2</sub> 0</sub> = m <sub>3</sub> - m <sub>2</sub>
 
m <sub>H <sub>2</sub> 0</sub> = m <sub>3</sub> - m <sub>2</sub>
  
V <sub>H <sub>2</sub> 0</sub> = m <sub>3</sub> - m <sub>2</sub> / ρ <sub>Pb</sub>
+
V <sub>H <sub>2</sub> 0</sub> = (m <sub>3</sub> - m <sub>2</sub>) / ρ <sub>Pb</sub> = V <sub>SP</sub> (The space between the lead)
 +
 
 +
ratio = V <sub>Pb</sub> / V <sub>tot</sub>
 +
 
 +
 
 +
 
 +
==Plan 2==
 +
By Volume
 +
 
 +
1 - V <sub>H <sub>2</sub> 0 1</sub> = V <sub>tot</sub>
 +
 
 +
2 - V <sub>H <sub>2</sub> 0 2</sub> = V <sub>SP</sub>
 +
 
 +
 
 +
V <sub>Pb</sub> = V <sub>tot</sub> - V <sub>SP</sub>
 +
 
 +
R = V <sub>Pb</sub> / V <sub>tot</sub> = (V <sub>tot</sub> - V <sub>SP</sub>) / V <sub>tot</sub> => 1 -  (V <sub>SP</sub> / V <sub>tot</sub>)

Revision as of 12:03, 15 July 2008

Plan 1

By Mass

1 - Empty box, m 1

2 - Box filled with Lead, m 2

3 - Box filled with Lead and H 2 0, m 3

4 - Box filled with H 2 0, m 4


m Pb = m 2 - m 1

V Pb = (m 2 - m 1) / ρ Pb


m H 2 0 = m 3 - m 2

V H 2 0 = (m 3 - m 2) / ρ Pb = V SP (The space between the lead)

ratio = V Pb / V tot


Plan 2

By Volume

1 - V H 2 0 1 = V tot

2 - V H 2 0 2 = V SP


V Pb = V tot - V SP

R = V Pb / V tot = (V tot - V SP) / V tot => 1 - (V SP / V tot)