Difference between revisions of "Things That Still Need to Get Done"

From New IAC Wiki
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
* Vacuum pipe and radiator ladder (design)
 
* Vacuum pipe and radiator ladder (design)
[[Image:ndetector.jpg|thumb|300 px]]
+
[[Image:ndetector.jpg|thumb|Data Acquisition Electronics|300 px]]
  
 
* Graphite block with Pb sheet (design /  fabrication)
 
* Graphite block with Pb sheet (design /  fabrication)
Line 14: Line 14:
 
* n<sup>o</sup> detector mount / shielding (design /  fabrication)
 
* n<sup>o</sup> detector mount / shielding (design /  fabrication)
  
* Data acquisition electronics
+
* Data acquisition electronics   <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math> <math>\rightarrow</math>
 
** Discriminators
 
** Discriminators
 
** Scalers
 
** Scalers
Line 22: Line 22:
  
 
* Beam position monitoring
 
* Beam position monitoring
 +
 +
[http://wiki.iac.isu.edu/index.php/PhotoFission_with_Polarized_Photons_from_HRRL Go Back]

Latest revision as of 06:27, 5 February 2009

  • Vacuum pipe and radiator ladder (design)
Data Acquisition Electronics
  • Graphite block with Pb sheet (design / fabrication)
  • Pb collimator (design / fabrication)
  • d20 target
  • d20 target mount
  • Get no detectors; high voltage (check them out)
  • no detector mount / shielding (design / fabrication)
  • Data acquisition electronics [math]\rightarrow[/math] [math]\rightarrow[/math] [math]\rightarrow[/math] [math]\rightarrow[/math] [math]\rightarrow[/math] [math]\rightarrow[/math]
    • Discriminators
    • Scalers
    • Take the digital pulse, send it into a counter (scaler), and it gives us a number.
  • Callibration procedure
  • Beam position monitoring

Go Back