Difference between revisions of "Things That Still Need to Get Done"

From New IAC Wiki
Jump to navigation Jump to search
Line 22: Line 22:
 
* Beam position monitoring
 
* Beam position monitoring
  
[[Image:ndetector.jpg]]
+
[[Image:ndetector.jpg\100 px]]

Revision as of 14:01, 3 July 2008

  • Vacuum pipe and radiator ladder (design)
  • Graphite block with Pb sheet (design / fabrication)
  • Pb collimator (design / fabrication)
  • d20 target
  • d20 target mount
  • Get no detectors; high voltage (check them out)
  • no detector mount / shielding (design / fabrication)
  • Data acquisition electronics
    • Discriminators
    • Scalers
    • Take the digital pulse, send it into a counter (scaler), and it gives us a number.
  • Callibration procedure
  • Beam position monitoring

File:Ndetector.jpg\100 px