Vacuum pipe and radiator ladder (design)
+
* Vacuum pipe and radiator ladder (design)
  
Graphite block with Pb sheet (design /  fabrication)
+
* Graphite block with Pb sheet (design /  fabrication)
  
Pb collimator (design /  fabrication)
+
* Pb collimator (design /  fabrication)
  
d<sub>2</sub>0 target
+
* d<sub>2</sub>0 target
  
d<sub>2</sub>0 target mount
+
* d<sub>2</sub>0 target mount
  
Get n<sup>o</sup> detectors; high voltage (check them out)
+
* Get n<sup>o</sup> detectors; high voltage (check them out)
  
n<sup>o</sup> detector mount / shielding (design /  fabrication)
+
* n<sup>o</sup> detector mount / shielding (design /  fabrication)
  
Data acquisition electronics
+
* Data acquisition electronics
* Discriminators
+
** Discriminators
 +
** Scalers
 +
** Take the digital pulse, send it into a counter (scaler), and it gives us a number.
  
* Scalers
+
* Callibration procedure
  
* Take the digital pulse, send it into a counter (scaler), and it gives us a number.
+
* Beam position monitoring
  
*[[Image:ndetector.jpg]]
+
[[Image:ndetector.jpg]]
 
 
• Callibration procedure
 
 
 
• Beam position monitoring
 

Revision as of 11:52, 3 July 2008

  • Vacuum pipe and radiator ladder (design)
  • Graphite block with Pb sheet (design / fabrication)
  • Pb collimator (design / fabrication)
  • d20 target
  • d20 target mount
  • Get no detectors; high voltage (check them out)
  • no detector mount / shielding (design / fabrication)
  • Data acquisition electronics
    • Discriminators
    • Scalers
    • Take the digital pulse, send it into a counter (scaler), and it gives us a number.
  • Callibration procedure
  • Beam position monitoring

Ndetector.jpg