Difference between revisions of "Qweak Related documents"

From New IAC Wiki
Jump to navigation Jump to search
 
(27 intermediate revisions by the same user not shown)
Line 1: Line 1:
=Region 1 related=
+
= Theory Papers=
=Proposal related=
 
  
== 1 page writeup for PAC proposal Jan 2008==
+
[http://arxiv.org/abs/0811.0614 Dispersion <math>\gamma Z</math>-box correction to the weak charge of the proton, M. Gorchtein, C.J. Horowitz, (2008)]
 +
= Proposal=
  
The Region 1 tracking system is designed to measure the location of scattered electrons less than 1 meter away from the target and in opposite octants.  The tracking system uses an ionization chamber equiped with Gas Electron Multiplier (GEM) preamplifiers  in order to handle the high radiation environements as well as enable a measurement of an ionization events location  within the chamber with a resolution of 100<math> \mu m</math>.  The system contains two ionization chambered located 180 degrees apart on a rotateable mounting system which allows two opposing octants to be measured simultaneously.  The rotateable mounting system can move the chambers through a 180 degree angle such that measurements may be made in all octants.  The current status of the Region 1 tracking system is given in the paragraphs below.
+
=Experiment =
  
The ionization chamber for Region 1 has achieved final design and is currently being constructed.  The GEM preamplifier foils have already been acquired and the readout board is curently being manufactured at CERN.  The ionization chamber itself has been machined and will be assembled upon receipt of the readout boards currently scheduled for the first quarter of 2008.
+
==Qweak PAC 2008 Writeup==
 +
[[Qweak_PAC2008_Writeup]]
  
The readout electronics for Region 1 use a readout board, know as the VFAT board from CERN, to digitize the analog signals on the readout board and send them to a VME crate to be recorded.  The control system for the VFAT board has been constructed and tested.  A signal junction box to transfer control signals for 6 VFAT boards to our system has been designed.  The junction box will also collect digital detector signals and transfer them to the CAEN V775 VME module.
 
  
The infrastucture to mount and rotate the chambers into position is 90% complete.  The system uses four caster wheels to mount an aluminum ring that has teeth on its outer surface which mess with a worm gear in order to rotate the ring.  One stepper motor is used on the worm gear to rotate the detector to within 1 mrad.  A stepper motor for each detector has been mounted on the ring itself in order to position each detector radially using fixed stops.  A controller for the all stepper motors has been programmed to move the detector between octants.  A GUI is currently under development which will be used in the counting house to position the detectors.
 
  
=Tracking related=
+
[http://www.iac.isu.edu/mediawiki/index.php/Qweak Go back]

Latest revision as of 15:48, 11 November 2008