Difference between revisions of "Mini-prototype"
Jump to navigation
Jump to search
Line 2: | Line 2: | ||
[[Image:MiniPrototypeWirePattern.jpg | 200 px]] | [[Image:MiniPrototypeWirePattern.jpg | 200 px]] | ||
=Mini-prototype Performance Measurements= | =Mini-prototype Performance Measurements= | ||
+ | === General Operating Condition=== | ||
+ | |||
+ | Our initial plan will be to use <math>ArCO_2</math> (75/25) flowing though the chamber | ||
+ | |||
+ | describe gas used, HV, signal electronics | ||
==Cosmic tests== | ==Cosmic tests== | ||
===scope pulses=== | ===scope pulses=== | ||
− | |||
− | |||
=== DAQ=== | === DAQ=== | ||
describe the DAQ for measuring detector output | describe the DAQ for measuring detector output |
Revision as of 22:58, 17 August 2007
Drift Chamber prototypes were constructed to evaluate drift chamber designs for CLAS12
Mini-prototype Performance Measurements
General Operating Condition
Our initial plan will be to use
(75/25) flowing though the chamberdescribe gas used, HV, signal electronics
Cosmic tests
scope pulses
DAQ
describe the DAQ for measuring detector output
Electron test facility
IAC 25 MeV electron accelerator
secondary electron beam setup
Description of collimation system goes here as well as lead pencil target. Description of how beam size will be measured or why it isn't needed.