Difference between revisions of "PAS Lead Tunnel"
Jump to navigation
Jump to search
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
Made lead brick tube 6/4/2021 | Made lead brick tube 6/4/2021 | ||
− | + | * Tunnel will need to be torn down and rebuilt as the entire exterior will need to have a layer of BorAl surrounding it. Once optimal operating point for NaI detector has been found, source in/out measurements will be made to determine signal:noise in tunnel. Will repeat the same experiment with the addition of BorAl. | |
− | + | * Internal measurements of rectangular tube 103mm x 152mm | |
− | Hope to 3D print cradle out of ABS plastic, possible to have one machined out of aluminum too | + | * Plan to model cradle for NaI detector to put crystal in the center of the tube. Crystal is 3in in diameter (yay units) |
+ | |||
+ | * Hope to 3D print cradle out of ABS plastic, possible to have one machined out of aluminum too | ||
{| class="wikitable " border="2" style="text-align:center;" |cellpadding="20" cellspacing="1 | {| class="wikitable " border="2" style="text-align:center;" |cellpadding="20" cellspacing="1 |
Latest revision as of 03:15, 5 June 2021
Made lead brick tube 6/4/2021
- Tunnel will need to be torn down and rebuilt as the entire exterior will need to have a layer of BorAl surrounding it. Once optimal operating point for NaI detector has been found, source in/out measurements will be made to determine signal:noise in tunnel. Will repeat the same experiment with the addition of BorAl.
- Internal measurements of rectangular tube 103mm x 152mm
- Plan to model cradle for NaI detector to put crystal in the center of the tube. Crystal is 3in in diameter (yay units)
- Hope to 3D print cradle out of ABS plastic, possible to have one machined out of aluminum too