Difference between revisions of "PAS Lead Tunnel"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
 
{| class="wikitable " border="2" style="text-align:center;" |cellpadding="20" cellspacing="1
 
{| class="wikitable " border="2" style="text-align:center;" |cellpadding="20" cellspacing="1
 
|-
 
|-
| [[File:|300px|thumb|left|Lead tunnel created on steel table in clean room. Detector will be mounted inside in a cradle ]] || [[File:|300px|thumb|center|Looking down the center of the lead tunnel. Detector will be mounted at the far end ]]
+
| [[File:PAS_Lead_Tunnel_1.jpg|300px|thumb|left|Lead tunnel created on steel table in clean room. Detector will be mounted inside in a cradle ]] || [[File:PAS_Lead_Tunnel_2.jpg|300px|thumb|center|Looking down the center of the lead tunnel. Detector will be mounted at the far end ]]
 
|-
 
|-
 
|}
 
|}

Revision as of 03:09, 5 June 2021

Made lead brick tube 6/4/2021

Internal measurements of rectangular tube 103mm x 152mm

Plan to model cradle for NaI detector to put crystal in the center of the tube. Crystal is 3in in diameter (yay units)

Hope to 3D print cradle, possible to have one machined too

[[File:|300px|thumb|left|Lead tunnel created on steel table in clean room. Detector will be mounted inside in a cradle ]]

[[File:|300px|thumb|center|Looking down the center of the lead tunnel. Detector will be mounted at the far end ]]


Lead tunnel created on steel table in clean room. Detector will be mounted inside in a cradle
Looking down the center of the lead tunnel. Detector will be mounted at the far end




PAS_Experimental_Setup