Difference between revisions of "Ftof p1a:Integrated Digitized Bank"

From New IAC Wiki
Jump to navigation Jump to search
Line 53: Line 53:
 
Geometry Description [https://www.jlab.org/Hall-B/ftof/notes/ftof_geom.pdf (CLAS12 NOTE 2016-?)]
 
Geometry Description [https://www.jlab.org/Hall-B/ftof/notes/ftof_geom.pdf (CLAS12 NOTE 2016-?)]
  
 
+
{|style="margin: 0 auto;"
[[File:ftof.png | thumb | center | FTOF Detector | 600px | Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1
+
| [[File:ftof.png | thumb | center | FTOF Detector | 600px | Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1
 
and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2
 
and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2
 
counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red.
 
counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red.
 
The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible
 
The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible
in this picture. The Forward Carriage is roughly 10 m in diameter.]][[File:ftof_parts.png | thumb | center | FTOF Parts | 600px | Figure 2: View of the FTOF scintillators for panel-1a, panel-1b, and panel-2 in the sector
+
in this picture. The Forward Carriage is roughly 10 m in diameter.]]
 +
| [[File:ftof_parts.png | thumb | center | FTOF Parts | 600px | Figure 2: View of the FTOF scintillators for panel-1a, panel-1b, and panel-2 in the sector
 
mid-plane with the key parameters indicated.]]
 
mid-plane with the key parameters indicated.]]
 +
  
 
[[File:ftof_sectors.png | thumb | center |FTOF Sectors | 600px |Figure 3: View of the upstream face of the Forward Carriage in Hall B showing the CLAS12
 
[[File:ftof_sectors.png | thumb | center |FTOF Sectors | 600px |Figure 3: View of the upstream face of the Forward Carriage in Hall B showing the CLAS12
 
sector naming conversion for Sector 1 (S1) through Sector 6 (S6). The dashed lines denote
 
sector naming conversion for Sector 1 (S1) through Sector 6 (S6). The dashed lines denote
 
the mid-planes for each sector.]]
 
the mid-planes for each sector.]]

Revision as of 15:24, 22 July 2016

Caption
SubBank Number Variable Description
1 sector
2 paddle
3 ADCL
4 ADCR
5 TDCL
6 TDCR
7 ADCLu
8 ADCRu
9 TDCLu
10 TDCRu
99 hitn

Geometry Description (CLAS12 NOTE 2016-?)

Figure 1: View of the FTOF counters for CLAS12 highlighting the location of the panel-1 and panel-2 counters. The panel-1b counter arrays are shown in orange and the panel-2 counter arrays, mounted around the perimeter of the Forward Carriage, are shown in red. The panel-1a counter arrays mounted just downstream of the panel-1b arrays are not visible in this picture. The Forward Carriage is roughly 10 m in diameter.
Figure 2: View of the FTOF scintillators for panel-1a, panel-1b, and panel-2 in the sector mid-plane with the key parameters indicated.


Figure 3: View of the upstream face of the Forward Carriage in Hall B showing the CLAS12 sector naming conversion for Sector 1 (S1) through Sector 6 (S6). The dashed lines denote the mid-planes for each sector.