Pages without language links
Jump to navigation
Jump to search
The following pages do not link to other language versions.
Showing below up to 500 results in range #1 to #500.
View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)
- (gamma,f) versus (gamma,f)
- -Deuteron photodisintegration kinematics
- -Investigate double gamma flash
- 03-19-2015
- 03-20-2017
- 03-21-2017
- 03-24-2015
- 03-26-2015
- 03-27-2015
- 03-30-2015
- 04-20-2015
- 04-21-2015
- 04-22-2015
- 04-9-2015
- 05-1-2017
- 05-2-2017
- 05-3-2017
- 05.21.11
- 05/09/2011
- 05/09/2011 source test
- 05/10/2011
- 05/10/2011 source test continue
- 05/11/2011
- 05/11/2011 n's detector threshold calibration
- 05/11/2011 neutron detector threshold calibration
- 05/12/2011
- 05/12/2011 2n correlation test
- 05/12/2011 random coincidence cosmic test
- 05/13/2011 PS1 (Tiana) detector threshold calibration
- 05/13/2011 coincidence rate test (PS1+PS2 and PS1+PS2+Det1)
- 05/13/2011 coincidence test
- 05/13/2011 timing test
- 05/16/2011 coincidence test
- 05/19/2011 n's detector threshold calibration source/(w/source)
- 071213
- 08/21-22/13
- 09-07-2016
- 09-07-2017
- 09-08-2016
- 09-08-2017
- 09-09-2016
- 09-09-2017
- 09-10-2017
- 09-11-2017
- 09-14-2017
- 09-15-2017
- 09-16-2017
- 09-17-2017
- 09-18-2017
- 09/23-27/2013
- 09122012 JlabShipment
- 1-2-07 Tuning
- 1-8-08 PrelimResults
- 10-29-08 GEM HRRL Photon Runs
- 10-30-08 GEM HRRL Photon Runs
- 10-31-08 GEM HRRL Photon Runs
- 10/30/13 Mayir
- 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
- 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
- 100mA, 100ns pulse width, 25cm from beam pipe
- 10312013 TestRun
- 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
- 11-10-2016
- 11-11-2016
- 11/21/2013 Be source
- 12-23-2016
- 12-GeV NSTAR
- 12/09/2013
- 12 10 2012 HRRL DetectorTests
- 137Cs Shot Log
- 170047 50% Se Soil Mixture Analysis
- 170048 10% Se Soil Mixture Analysis
- 170049 1% Se Soil Mixture Analysis
- 170050 0.1% Se Soil Mixture Analysis
- 1938:D2O Beam-down
- 1938:D2O Beam-down ND TOF
- 1938:D2O Beam-down ND TOF calibration
- 1938:D2O Beam-down ND energy
- 1938:D2O Beam-down ND energy neutronsOnly
- 1939:D2O Beam-down
- 1939:D2O Beam-down ND TOF
- 1939:D2O Beam-down ND TOF calibration
- 1939:D2O Beam-down ND energy
- 1939:D2O Beam-down ND energy neutronsOnly
- 1940:D2O Beam-down
- 1940:D2O Beam-down ND TOF
- 1940:D2O Beam-down ND TOF calibration
- 1940:D2O Beam-down ND energy
- 1940:D2O Beam-down ND energy neutronsOnly
- 1941:D2O Beam-up
- 1941:D2O Beam-up ND TOF
- 1941:D2O Beam-up ND TOF calibration
- 1941:D2O Beam-up ND energy
- 1941:D2O Beam-up ND energy neutronsOnly
- 1944:D2O Beam-down
- 1944:D2O Beam-down ND TOF
- 1944:D2O Beam-down ND TOF calibration
- 1944:D2O Beam-down ND energy
- 1944:D2O Beam-down ND energy neutronsOnly
- 1945:D2O Beam-up
- 1945:D2O Beam-up ND TOF
- 1945:D2O Beam-up ND TOF calibration
- 1945:D2O Beam-up ND energy
- 1945:D2O Beam-up ND energy neutronsOnly
- 1946:D2O Beam-up Rad-out
- 1946:D2O Beam-up Rad-out ND TOF
- 1946:D2O Beam-up Rad-out ND TOF calibration
- 1946:D2O Beam-up Rad-out ND energy
- 1946:D2O Beam-up Rad-out ND energy neutronsOnly
- 1947:H2O Beam-up
- 1947:H2O Beam-up ND TOF
- 1947:H2O Beam-up ND TOF calibration
- 1947:H2O Beam-up ND energy
- 1947:H2O Beam-up ND energy neutronsOnly
- 1948:H2O Beam-down
- 1948:H2O Beam-down ND TOF
- 1948:H2O Beam-down ND TOF calibration
- 1948:H2O Beam-down ND energy
- 1948:H2O Beam-down ND energy neutronsOnly
- 1949:DU
- 1949:DU ND TOF
- 1949:DU ND TOF calibration
- 1949:DU ND energy
- 1949:DU ND energy neutronsOnly
- 1 credit vs 9 credits
- 2-LTD-brick x-pinch driver
- 2-LTD-brick x-pinch driver notes
- 2-Neutron Correlation
- 2-Neutron Correlation Setup Stuff
- 2007 Interns
- 2007 Proposal
- 2008 NSF Proposal
- 2009
- 2010
- 20101019 BlackRockCanyon
- 2011
- 20110131 OxfordPeak
- 20110626 MirriamLakeIdaho
- 201109 R1ProgressRep
- 201110 R1ProgressRep
- 201111 R1ProgressRep
- 201112 R1ProgressRep
- 2011 44MeV Analysis 2011
- 2011 NSF Proposal
- 2012
- 201201 R1ProgressRep
- 201202 R1ProgressRep
- 201203 R1ProgressRep
- 201204 R1ProgressRep
- 201205 R1ProgressRep
- 201206 R1ProgressRep
- 201207 R1ProgressRep
- 201208 R1ProgressRep
- 201209 R1ProgressRep
- 201210 R1ProgressRep
- 201211 R1ProgressRep
- 201212 R1ProgressRep
- 2012AnnihCountrRateEstimate
- 2012 NSF Proposal
- 2012 run DAQ malfunction
- 201301 R1ProgressRep
- 201302 R1ProgressRep
- 201303 R1ProgressRep
- 201304 R1ProgressRep
- 201305 R1ProgressRep
- 201306 R1ProgressRep
- 201307 R1ProgressRep
- 201308 R1ProgressRep
- 201309 R1ProgressRep
- 201310 R1ProgressRep
- 201311 R1ProgressRep
- 201312 R1ProgressRep
- 2013 MRI CLAS12 LeveL2Trig
- 201401 R1ProgressRep
- 201402 R1ProgressRep
- 201403 R1ProgressRep
- 2015 NSF Proposal
- 2018 NSF Proposal
- 2020 NSF Proposal
- 20min run peak sensing histograms
- 252CF
- 25MeV Neutron Detector Set-up
- 25MeV Neutron Detector Setup
- 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
- 25mA, 100ns pulse width, 25cm from beam pipe
- 25mA, 100ns pulse width, 50cm from beam pipe
- 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
- 2D Faraday Cup Data Analysis
- 2NCorr E1 E2 correlations VS theta abs
- 2NCorr Forward Detectors
- 2NCorr Photon flux estimate
- 2NCorr Rates 2017
- 2NCorr SPDP Introduction
- 2NCorr SP DP analysis
- 2NCorr neutron ToF cut
- 2 Bricks Fabrication
- 2 LTD bricks driver progress
- 2cm XLineTarg 270 Degree Rotation 09/23/16
- 2cm XLineTarg 90 Degree Rotation 09/23/16
- 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
- 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
- 2cm YLineTarg 0 Degree Rotation 09/23/16
- 2cm YLineTarg 180 Degree Rotation 09/23/16
- 2cm YLineTarg 210 Degree Rotation 09/23/16
- 2cm YLineTarg 30 Degree Rotation 09/23/16
- 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
- 2nCor 44
- 2nCor Equipment
- 2n ASCII files
- 2n BKG data
- 2n Corr JeffsPlots
- 2n D2O/H2O/Empty target data
- 2n DU data
- 2n Detector efficiency test
- 2n Equipment
- 2n Neutron signal attenuation
- 2n Position resolution
- 2n TDC map
- 2n corr theta VS n-n energies
- 2n corr theta VS n-n energies (1)
- 2n corr theta VS n-n energies (2)
- 2n corr theta VS n-n energies (3)
- 2n corr theta VS n-n energies (4)
- 2n correlations
- 2n correlations in Photofission
- 2n geometry of the setup
- 2n opening angle
- 2n preliminary data analysis
- 2n run list
- 3N Corr
- 4-gradient
- 4-momenta
- 4-vectors
- 40MeV BeamLineInstall 10252013
- 44 Linac Exit Geometry
- 44 MeV Beam Line Optimization
- 44 Setup
- 5-19-08
- 511 keV photon attenuation in tungsten
- 5252017 Anal
- 52x48 Steel Table
- 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
- 6cm ZLineTarg 0 Degree Rotation 09/23/16
- 6cm ZLineTarg 270 Degree Rotation 09/23/16
- 6cm ZLineTarg 90 Degree Rotation 09/23/16
- 8-07-2017
- 8-08-2017
- 8-09-2017
- 8-10-2017
- 8-11-2017
- 8-14-2017
- 8-15-2017
- 8-16-2017
- 8-17-2017
- 8-18-2017
- 8 Channel CFD
- 90 degree beamline extension
- ACCAPP 09 PhotFis Poster
- ADBcrate CLAS12
- ADC
- ADC 3 Histogram Table
- ADC 7 Histogram Table
- ADS
- ASCII data files
- AW ADC 3 Histogram
- AW ADC 7 Histogram
- AW CLAS12R1
- AW Singles Prob Y88 2015
- A W CAA apparatus
- A W thesis
- A W thesis old
- A kind of analysis
- Absorbed Dose Information
- Abstract
- AccApp07
- Accelerator-Driven System
- Accelerator Driven Nuclear Reactor
- Accelerators Physics
- Accelerators Physics. Dr Kim Fall 2010
- Actinium Production
- Adding Apache Shares
- Admin Server
- Airline internet booking
- Airport Network Infrastructure
- Aka kaka
- Al subtracted ToF/Energy specrta
- All 3 detectors working
- All D2O Beam-down
- All D2O Beam-up
- Alpha Ionization
- Alpha particle simulation related
- Alter Phi Angles
- Altering Phi Angles
- Aluminum Converter
- Aluminum Thickness Tests
- Amex Promotion
- Analysis
- Analysis.groovy
- Analysis 03-26-2015
- Analysis of evio files
- Analysis of may 2017 runs
- Analysis scripts
- Angular distribution of neutrons from the photodisintegration of deuterium
- Anisotropic n's vs. isotropic ones
- Apartment
- Apex
- Api PubCLAS2000
- Apparatus Layout
- Apply, due: Jan 15 2014
- April
- April: Threshold Study
- April 17th 2017
- April 17th 2017 (PAA)
- Apt-Proxy
- ArCO2 IonizationPhysics
- Attenuation Measurements
- Attenuation Measurements NaI
- Au-196 5-08-22-13
- Au-196 Foil-08-22-13
- Aug 2017 ChkList
- August 10th 2017
- August 11th 2017
- August 14, 2007 - Cosmic Telescope
- August 14th 2017
- August 15, 2007 - Cosmic Telescope
- August 15th 2017
- August 16, 2007 - Cosmic Telescope
- August 17, 2007 - Cosmic Telescope
- August 23, 2007 - Cosmic Telescope
- August 24, 2007 - Cosmic Telescope
- August 27, 2007 - Cosmic Telescope
- August 28, 2007 - Cosmic Telescope
- August 29, 2007 - Cosmic Telescope
- August 30, 2007 - Cosmic Telescope
- August 31, 2007 - Cosmic Telescope
- August 8th 2017
- August 9th 2017
- B-field calculation
- BO-08-22-13
- BUILD GEMC SIMULATION.sh
- Back of the envelope calculation for e+/e- ratio
- Background
- BackupPC Notes
- Bayesian Nonparametrics
- BeamPipeHeating 4mmthick PbBi PositronTarget
- Beam Position Monitor Tests in HRRL
- Beam Test Apr 24 2012
- Beam Test Apr 26 2012
- Beam Test Jul 11 2012
- Beam Test Jul 12 2012
- Beam Test Jul 16 2012
- Beam Test Jul 17 2012
- Beam Test Jul 18 2012
- Beam Test Jul 19 2012
- Beam Test Jul 20 2012
- Beam Test Jul 23 2012
- Beam Test Jul 24 2012
- Beam Test Jul 25 2012
- Beam Test Jul 26 2012
- Beam Test Jul 27 2012
- Beam Test Jul 5 2012
- Beam Text May 17 2012
- Beam dump and sweep magnet G4 model
- Beam spot with a fancy Dan's screen
- Beamline Drawing 2011 J.Ellis
- Beamline Parts
- Beamline design (G. Stancari)
- Beamline design (Y. Kim)
- Beamline design drawing
- Benchmark GEMC Occupancy Prediction for 11GeV Electron Beam with 0T Solenoid for LH2
- Beta Transmission and Ionization
- BeulaLakeWY
- Bibliography
- Big Red
- Bin Shapes
- Bin Test
- Boise
- Bomb yield determination
- Books
- BoratedAluminum
- BoreShield
- Breakout Board Design
- Brem converter optimization
- Brems
- Brems Intensity Spectrum (with Collimation Factors) Plots
- Brems Intensity Spectrum (without Collimation Factors) Plots
- Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator
- Bremsstrahlung radiation properties, Ee=25 MeV
- BrianMuchilwa HW12
- Brian Articles
- Brian ToDo
- Brian mingw
- BriansRanLogbook
- Bubbl, Online Flowchart Too
- Bubbl, Online Flowchart Tool
- Bull
- Burg jeff E1 E2.py
- C++
- C-19
- CAA NaI HpGe CoinSetup
- CAD Components
- CAEN QDC V792
- CAEN TDC V 775
- CAEN V1290A TDC
- CAEN V1495 ADC
- CAEN V1495 IO
- CAEN V260 Scalr
- CAEN V488 TDC
- CAEN V775 TDC
- CAEN V785N ADC
- CAEN V792 ADC
- CAEN VX1190A TDC
- CAPSDAQ
- CED Verification of DC Angle Theta and Wire Correspondance
- CHIPS
- CHIPS IAC Run 5-27-08
- CHIPS IAC Run 5-28-08
- CHIPS IAC Run 5-29-08
- CHIPS IAC Run 5-30-08
- CHIPS Run Feb-2008
- CHIPS Run May-2008
- CHIPS collaboration
- CH 3D Printing
- CH 785NADC
- CH Calibration Sources
- CH Cf252 Sources
- CH Clean Room Renovations
- CH Code Repository
- CH DAQ2 Energy Calibration
- CH DD Ga
- CH Discriminator Dual Pulsing
- CH Gd Holders
- CH Gd Spectra
- CH HPGe Detector
- CH HPGe Efficiency
- CH HPGe Electronics Chain
- CH HPGe Log
- CH HPGe Work
- CH He3 Attenuation Measurements
- CH He3 Attenuation Measurements: 3 Different Cf252 Sources
- CH He3 Attenuation Measurements Repeated
- CH He3 Attenuation Measurements Revisited
- CH He3 Background Measurements
- CH He3 Pre-amp Noise Investigation
- CH He3 w/BorAl Gd In/Out
- CH High Activity Cf252
- CH Isotope Table
- CH Low Activity Cf252
- CH Meeting Notes
- CH NIM Bin Repair
- CH Outline
- CH PAS HPGe Amp Adjustment
- CH PAS He3 BorAl Attenuation Study
- CH PAS He3 Poly Boration Study
- CH PAS Master Logbook
- CH PAS Master Timeline
- CH PhD
- CH Phase II Run Plan
- CH Physics Questions
- CH Poly Density
- CH Preliminary Examination
- CH ROOT Nonuniform Binning
- CH Starting CODA & Reading CODA Data
- CH Task List
- CH Thesis
- CH Thesis Revision 1
- CH UNCL
- CH Weekly Reports
- CI Model 1416 Amplifier
- CLARA
- CLAS12DC ProjFactoids
- CLAS12R1ReadinessReview2011
- CLAS12R1 CosmicTestStand
- CLAS12R1 WireQualPic
- CLAS12 CleaRoomPrep 2011
- CLAS12 FastMC
- CLAS12 GEMC
- CLAS12 InclusiveRateEst4EG12
- CLAS12 MollerDataTable 12-16-2018
- CLAS12 R1
- CLAS12 R1 Progress Reports
- CLAS12 R1 Prototype 2-20-08
- CLAS12 R1 Prototype 9-16-07
- CLAS12 R1 S1 QA
- CLAS12 R1 S2 PrePotTensErr
- CLAS12 R1 S2 QA
- CLAS12 R1 S3 PrePotTensErr
- CLAS12 R1 S3 QA
- CLAS12 R1 S5 QA
- CLAS12 R1 S6 QA
- CLAS12 R1 SOW
- CLAS12 R1 Stringing Manual
- CLAS12 RateEst byWA
- CLAS12 SIDISpionRateEst4EG12
- CLAS12 Software
- CLAS12 r4135
- CLAS12 r4136
- CLAS12 r4139
- CLAS12 r4141
- CLAS6 Software