Pages without language links

Jump to navigation Jump to search

The following pages do not link to other language versions.

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (gamma,f) versus (gamma,f)
  2. -Deuteron photodisintegration kinematics
  3. -Investigate double gamma flash
  4. 03-19-2015
  5. 03-20-2017
  6. 03-21-2017
  7. 03-24-2015
  8. 03-26-2015
  9. 03-27-2015
  10. 03-30-2015
  11. 04-20-2015
  12. 04-21-2015
  13. 04-22-2015
  14. 04-9-2015
  15. 05-1-2017
  16. 05-2-2017
  17. 05-3-2017
  18. 05.21.11
  19. 05/09/2011
  20. 05/09/2011 source test
  21. 05/10/2011
  22. 05/10/2011 source test continue
  23. 05/11/2011
  24. 05/11/2011 n's detector threshold calibration
  25. 05/11/2011 neutron detector threshold calibration
  26. 05/12/2011
  27. 05/12/2011 2n correlation test
  28. 05/12/2011 random coincidence cosmic test
  29. 05/13/2011 PS1 (Tiana) detector threshold calibration
  30. 05/13/2011 coincidence rate test (PS1+PS2 and PS1+PS2+Det1)
  31. 05/13/2011 coincidence test
  32. 05/13/2011 timing test
  33. 05/16/2011 coincidence test
  34. 05/19/2011 n's detector threshold calibration source/(w/source)
  35. 071213
  36. 08/21-22/13
  37. 09-07-2016
  38. 09-07-2017
  39. 09-08-2016
  40. 09-08-2017
  41. 09-09-2016
  42. 09-09-2017
  43. 09-10-2017
  44. 09-11-2017
  45. 09-14-2017
  46. 09-15-2017
  47. 09-16-2017
  48. 09-17-2017
  49. 09-18-2017
  50. 09/23-27/2013
  51. 09122012 JlabShipment
  52. 1-2-07 Tuning
  53. 1-8-08 PrelimResults
  54. 10-29-08 GEM HRRL Photon Runs
  55. 10-30-08 GEM HRRL Photon Runs
  56. 10-31-08 GEM HRRL Photon Runs
  57. 10/30/13 Mayir
  58. 1000 Events per degree in the range 5 to 40 degrees for Lab Frame
  59. 100mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  60. 100mA, 100ns pulse width, 25cm from beam pipe
  61. 10312013 TestRun
  62. 10mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  63. 11-10-2016
  64. 11-11-2016
  65. 11/21/2013 Be source
  66. 12-23-2016
  67. 12-GeV NSTAR
  68. 12/09/2013
  69. 12 10 2012 HRRL DetectorTests
  70. 137Cs Shot Log
  71. 170047 50% Se Soil Mixture Analysis
  72. 170048 10% Se Soil Mixture Analysis
  73. 170049 1% Se Soil Mixture Analysis
  74. 170050 0.1% Se Soil Mixture Analysis
  75. 1938:D2O Beam-down
  76. 1938:D2O Beam-down ND TOF
  77. 1938:D2O Beam-down ND TOF calibration
  78. 1938:D2O Beam-down ND energy
  79. 1938:D2O Beam-down ND energy neutronsOnly
  80. 1939:D2O Beam-down
  81. 1939:D2O Beam-down ND TOF
  82. 1939:D2O Beam-down ND TOF calibration
  83. 1939:D2O Beam-down ND energy
  84. 1939:D2O Beam-down ND energy neutronsOnly
  85. 1940:D2O Beam-down
  86. 1940:D2O Beam-down ND TOF
  87. 1940:D2O Beam-down ND TOF calibration
  88. 1940:D2O Beam-down ND energy
  89. 1940:D2O Beam-down ND energy neutronsOnly
  90. 1941:D2O Beam-up
  91. 1941:D2O Beam-up ND TOF
  92. 1941:D2O Beam-up ND TOF calibration
  93. 1941:D2O Beam-up ND energy
  94. 1941:D2O Beam-up ND energy neutronsOnly
  95. 1944:D2O Beam-down
  96. 1944:D2O Beam-down ND TOF
  97. 1944:D2O Beam-down ND TOF calibration
  98. 1944:D2O Beam-down ND energy
  99. 1944:D2O Beam-down ND energy neutronsOnly
  100. 1945:D2O Beam-up
  101. 1945:D2O Beam-up ND TOF
  102. 1945:D2O Beam-up ND TOF calibration
  103. 1945:D2O Beam-up ND energy
  104. 1945:D2O Beam-up ND energy neutronsOnly
  105. 1946:D2O Beam-up Rad-out
  106. 1946:D2O Beam-up Rad-out ND TOF
  107. 1946:D2O Beam-up Rad-out ND TOF calibration
  108. 1946:D2O Beam-up Rad-out ND energy
  109. 1946:D2O Beam-up Rad-out ND energy neutronsOnly
  110. 1947:H2O Beam-up
  111. 1947:H2O Beam-up ND TOF
  112. 1947:H2O Beam-up ND TOF calibration
  113. 1947:H2O Beam-up ND energy
  114. 1947:H2O Beam-up ND energy neutronsOnly
  115. 1948:H2O Beam-down
  116. 1948:H2O Beam-down ND TOF
  117. 1948:H2O Beam-down ND TOF calibration
  118. 1948:H2O Beam-down ND energy
  119. 1948:H2O Beam-down ND energy neutronsOnly
  120. 1949:DU
  121. 1949:DU ND TOF
  122. 1949:DU ND TOF calibration
  123. 1949:DU ND energy
  124. 1949:DU ND energy neutronsOnly
  125. 1 credit vs 9 credits
  126. 2-LTD-brick x-pinch driver
  127. 2-LTD-brick x-pinch driver notes
  128. 2-Neutron Correlation
  129. 2-Neutron Correlation Setup Stuff
  130. 2007 Interns
  131. 2007 Proposal
  132. 2008 NSF Proposal
  133. 2009
  134. 2010
  135. 20101019 BlackRockCanyon
  136. 2011
  137. 20110131 OxfordPeak
  138. 20110626 MirriamLakeIdaho
  139. 201109 R1ProgressRep
  140. 201110 R1ProgressRep
  141. 201111 R1ProgressRep
  142. 201112 R1ProgressRep
  143. 2011 44MeV Analysis 2011
  144. 2011 NSF Proposal
  145. 2012
  146. 201201 R1ProgressRep
  147. 201202 R1ProgressRep
  148. 201203 R1ProgressRep
  149. 201204 R1ProgressRep
  150. 201205 R1ProgressRep
  151. 201206 R1ProgressRep
  152. 201207 R1ProgressRep
  153. 201208 R1ProgressRep
  154. 201209 R1ProgressRep
  155. 201210 R1ProgressRep
  156. 201211 R1ProgressRep
  157. 201212 R1ProgressRep
  158. 2012AnnihCountrRateEstimate
  159. 2012 NSF Proposal
  160. 2012 run DAQ malfunction
  161. 201301 R1ProgressRep
  162. 201302 R1ProgressRep
  163. 201303 R1ProgressRep
  164. 201304 R1ProgressRep
  165. 201305 R1ProgressRep
  166. 201306 R1ProgressRep
  167. 201307 R1ProgressRep
  168. 201308 R1ProgressRep
  169. 201309 R1ProgressRep
  170. 201310 R1ProgressRep
  171. 201311 R1ProgressRep
  172. 201312 R1ProgressRep
  173. 2013 MRI CLAS12 LeveL2Trig
  174. 201401 R1ProgressRep
  175. 201402 R1ProgressRep
  176. 201403 R1ProgressRep
  177. 2015 NSF Proposal
  178. 2018 NSF Proposal
  179. 2020 NSF Proposal
  180. 20min run peak sensing histograms
  181. 252CF
  182. 25MeV Neutron Detector Set-up
  183. 25MeV Neutron Detector Setup
  184. 25mA, 100ns pulse width, 100cm from beam pipe, with Titanium window
  185. 25mA, 100ns pulse width, 25cm from beam pipe
  186. 25mA, 100ns pulse width, 50cm from beam pipe
  187. 25mA, 100ns pulse width, 50cm from beam pipe, tungsten target with aluminum beamstop
  188. 2D Faraday Cup Data Analysis
  189. 2NCorr E1 E2 correlations VS theta abs
  190. 2NCorr Forward Detectors
  191. 2NCorr Photon flux estimate
  192. 2NCorr Rates 2017
  193. 2NCorr SPDP Introduction
  194. 2NCorr SP DP analysis
  195. 2NCorr neutron ToF cut
  196. 2 Bricks Fabrication
  197. 2 LTD bricks driver progress
  198. 2cm XLineTarg 270 Degree Rotation 09/23/16
  199. 2cm XLineTarg 90 Degree Rotation 09/23/16
  200. 2cm XYTarg Z=0 Vx and Vy Differences 09/23/16
  201. 2cm XZTarg Y=0 Vx and Vz Differences 09/23/16
  202. 2cm YLineTarg 0 Degree Rotation 09/23/16
  203. 2cm YLineTarg 180 Degree Rotation 09/23/16
  204. 2cm YLineTarg 210 Degree Rotation 09/23/16
  205. 2cm YLineTarg 30 Degree Rotation 09/23/16
  206. 2cm YZTarg X=0 Vz and Vy Difference 09/23/16
  207. 2nCor 44
  208. 2nCor Equipment
  209. 2n ASCII files
  210. 2n BKG data
  211. 2n Corr JeffsPlots
  212. 2n D2O/H2O/Empty target data
  213. 2n DU data
  214. 2n Detector efficiency test
  215. 2n Equipment
  216. 2n Neutron signal attenuation
  217. 2n Position resolution
  218. 2n TDC map
  219. 2n corr theta VS n-n energies
  220. 2n corr theta VS n-n energies (1)
  221. 2n corr theta VS n-n energies (2)
  222. 2n corr theta VS n-n energies (3)
  223. 2n corr theta VS n-n energies (4)
  224. 2n correlations
  225. 2n correlations in Photofission
  226. 2n geometry of the setup
  227. 2n opening angle
  228. 2n preliminary data analysis
  229. 2n run list
  230. 3N Corr
  231. 4-gradient
  232. 4-momenta
  233. 4-vectors
  234. 40MeV BeamLineInstall 10252013
  235. 44 Linac Exit Geometry
  236. 44 MeV Beam Line Optimization
  237. 44 Setup
  238. 5-19-08
  239. 511 keV photon attenuation in tungsten
  240. 5252017 Anal
  241. 52x48 Steel Table
  242. 5mA, 100ns pulse width, 100cm from beam pipe with Titanium window
  243. 6cm ZLineTarg 0 Degree Rotation 09/23/16
  244. 6cm ZLineTarg 270 Degree Rotation 09/23/16
  245. 6cm ZLineTarg 90 Degree Rotation 09/23/16
  246. 8-07-2017
  247. 8-08-2017
  248. 8-09-2017
  249. 8-10-2017
  250. 8-11-2017
  251. 8-14-2017
  252. 8-15-2017
  253. 8-16-2017
  254. 8-17-2017
  255. 8-18-2017
  256. 8 Channel CFD
  257. 90 degree beamline extension
  258. ACCAPP 09 PhotFis Poster
  259. ADBcrate CLAS12
  260. ADC
  261. ADC 3 Histogram Table
  262. ADC 7 Histogram Table
  263. ADS
  264. ASCII data files
  265. AW ADC 3 Histogram
  266. AW ADC 7 Histogram
  267. AW CLAS12R1
  268. AW Singles Prob Y88 2015
  269. A W CAA apparatus
  270. A W thesis
  271. A W thesis old
  272. A kind of analysis
  273. Absorbed Dose Information
  274. Abstract
  275. AccApp07
  276. Accelerator-Driven System
  277. Accelerator Driven Nuclear Reactor
  278. Accelerators Physics
  279. Accelerators Physics. Dr Kim Fall 2010
  280. Actinium Production
  281. Adding Apache Shares
  282. Admin Server
  283. Airline internet booking
  284. Airport Network Infrastructure
  285. Aka kaka
  286. Al subtracted ToF/Energy specrta
  287. All 3 detectors working
  288. All D2O Beam-down
  289. All D2O Beam-up
  290. Alpha Ionization
  291. Alpha particle simulation related
  292. Alter Phi Angles
  293. Altering Phi Angles
  294. Aluminum Converter
  295. Aluminum Thickness Tests
  296. Amex Promotion
  297. Analysis
  298. Analysis.groovy
  299. Analysis 03-26-2015
  300. Analysis of evio files
  301. Analysis of may 2017 runs
  302. Analysis scripts
  303. Angular distribution of neutrons from the photodisintegration of deuterium
  304. Anisotropic n's vs. isotropic ones
  305. Apartment
  306. Apex
  307. Api PubCLAS2000
  308. Apparatus Layout
  309. Apply, due: Jan 15 2014
  310. April
  311. April: Threshold Study
  312. April 17th 2017
  313. April 17th 2017 (PAA)
  314. Apt-Proxy
  315. ArCO2 IonizationPhysics
  316. Attenuation Measurements
  317. Attenuation Measurements NaI
  318. Au-196 5-08-22-13
  319. Au-196 Foil-08-22-13
  320. Aug 2017 ChkList
  321. August 10th 2017
  322. August 11th 2017
  323. August 14, 2007 - Cosmic Telescope
  324. August 14th 2017
  325. August 15, 2007 - Cosmic Telescope
  326. August 15th 2017
  327. August 16, 2007 - Cosmic Telescope
  328. August 17, 2007 - Cosmic Telescope
  329. August 23, 2007 - Cosmic Telescope
  330. August 24, 2007 - Cosmic Telescope
  331. August 27, 2007 - Cosmic Telescope
  332. August 28, 2007 - Cosmic Telescope
  333. August 29, 2007 - Cosmic Telescope
  334. August 30, 2007 - Cosmic Telescope
  335. August 31, 2007 - Cosmic Telescope
  336. August 8th 2017
  337. August 9th 2017
  338. B-field calculation
  339. BO-08-22-13
  340. BUILD GEMC SIMULATION.sh
  341. Back of the envelope calculation for e+/e- ratio
  342. Background
  343. BackupPC Notes
  344. Bayesian Nonparametrics
  345. BeamPipeHeating 4mmthick PbBi PositronTarget
  346. Beam Position Monitor Tests in HRRL
  347. Beam Test Apr 24 2012
  348. Beam Test Apr 26 2012
  349. Beam Test Jul 11 2012
  350. Beam Test Jul 12 2012
  351. Beam Test Jul 16 2012
  352. Beam Test Jul 17 2012
  353. Beam Test Jul 18 2012
  354. Beam Test Jul 19 2012
  355. Beam Test Jul 20 2012
  356. Beam Test Jul 23 2012
  357. Beam Test Jul 24 2012
  358. Beam Test Jul 25 2012
  359. Beam Test Jul 26 2012
  360. Beam Test Jul 27 2012
  361. Beam Test Jul 5 2012
  362. Beam Text May 17 2012
  363. Beam dump and sweep magnet G4 model
  364. Beam spot with a fancy Dan's screen
  365. Beamline Drawing 2011 J.Ellis
  366. Beamline Parts
  367. Beamline design (G. Stancari)
  368. Beamline design (Y. Kim)
  369. Beamline design drawing
  370. Benchmark GEMC Occupancy Prediction for 11GeV Electron Beam with 0T Solenoid for LH2
  371. Beta Transmission and Ionization
  372. BeulaLakeWY
  373. Bibliography
  374. Big Red
  375. Bin Shapes
  376. Bin Test
  377. Boise
  378. Bomb yield determination
  379. Books
  380. BoratedAluminum
  381. BoreShield
  382. Breakout Board Design
  383. Brem converter optimization
  384. Brems
  385. Brems Intensity Spectrum (with Collimation Factors) Plots
  386. Brems Intensity Spectrum (without Collimation Factors) Plots
  387. Bremsstrahlung lineshape for E0 = 16 MeV, Ti radiator
  388. Bremsstrahlung radiation properties, Ee=25 MeV
  389. BrianMuchilwa HW12
  390. Brian Articles
  391. Brian ToDo
  392. Brian mingw
  393. BriansRanLogbook
  394. Bubbl, Online Flowchart Too
  395. Bubbl, Online Flowchart Tool
  396. Bull
  397. Burg jeff E1 E2.py
  398. C++
  399. C-19
  400. CAA NaI HpGe CoinSetup
  401. CAD Components
  402. CAEN QDC V792
  403. CAEN TDC V 775
  404. CAEN V1290A TDC
  405. CAEN V1495 ADC
  406. CAEN V1495 IO
  407. CAEN V260 Scalr
  408. CAEN V488 TDC
  409. CAEN V775 TDC
  410. CAEN V785N ADC
  411. CAEN V792 ADC
  412. CAEN VX1190A TDC
  413. CAPSDAQ
  414. CED Verification of DC Angle Theta and Wire Correspondance
  415. CHIPS
  416. CHIPS IAC Run 5-27-08
  417. CHIPS IAC Run 5-28-08
  418. CHIPS IAC Run 5-29-08
  419. CHIPS IAC Run 5-30-08
  420. CHIPS Run Feb-2008
  421. CHIPS Run May-2008
  422. CHIPS collaboration
  423. CH 3D Printing
  424. CH 785NADC
  425. CH Calibration Sources
  426. CH Cf252 Sources
  427. CH Clean Room Renovations
  428. CH Code Repository
  429. CH DAQ2 Energy Calibration
  430. CH DD Ga
  431. CH Discriminator Dual Pulsing
  432. CH Gd Holders
  433. CH Gd Spectra
  434. CH HPGe Detector
  435. CH HPGe Efficiency
  436. CH HPGe Electronics Chain
  437. CH HPGe Log
  438. CH HPGe Work
  439. CH He3 Attenuation Measurements
  440. CH He3 Attenuation Measurements: 3 Different Cf252 Sources
  441. CH He3 Attenuation Measurements Repeated
  442. CH He3 Attenuation Measurements Revisited
  443. CH He3 Background Measurements
  444. CH He3 Pre-amp Noise Investigation
  445. CH He3 w/BorAl Gd In/Out
  446. CH High Activity Cf252
  447. CH Isotope Table
  448. CH Low Activity Cf252
  449. CH Meeting Notes
  450. CH NIM Bin Repair
  451. CH Outline
  452. CH PAS HPGe Amp Adjustment
  453. CH PAS He3 BorAl Attenuation Study
  454. CH PAS He3 Poly Boration Study
  455. CH PAS Master Logbook
  456. CH PAS Master Timeline
  457. CH PhD
  458. CH Phase II Run Plan
  459. CH Physics Questions
  460. CH Poly Density
  461. CH Preliminary Examination
  462. CH ROOT Nonuniform Binning
  463. CH Starting CODA & Reading CODA Data
  464. CH Task List
  465. CH Thesis
  466. CH Thesis Revision 1
  467. CH UNCL
  468. CH Weekly Reports
  469. CI Model 1416 Amplifier
  470. CLARA
  471. CLAS12DC ProjFactoids
  472. CLAS12R1ReadinessReview2011
  473. CLAS12R1 CosmicTestStand
  474. CLAS12R1 WireQualPic
  475. CLAS12 CleaRoomPrep 2011
  476. CLAS12 FastMC
  477. CLAS12 GEMC
  478. CLAS12 InclusiveRateEst4EG12
  479. CLAS12 MollerDataTable 12-16-2018
  480. CLAS12 R1
  481. CLAS12 R1 Progress Reports
  482. CLAS12 R1 Prototype 2-20-08
  483. CLAS12 R1 Prototype 9-16-07
  484. CLAS12 R1 S1 QA
  485. CLAS12 R1 S2 PrePotTensErr
  486. CLAS12 R1 S2 QA
  487. CLAS12 R1 S3 PrePotTensErr
  488. CLAS12 R1 S3 QA
  489. CLAS12 R1 S5 QA
  490. CLAS12 R1 S6 QA
  491. CLAS12 R1 SOW
  492. CLAS12 R1 Stringing Manual
  493. CLAS12 RateEst byWA
  494. CLAS12 SIDISpionRateEst4EG12
  495. CLAS12 Software
  496. CLAS12 r4135
  497. CLAS12 r4136
  498. CLAS12 r4139
  499. CLAS12 r4141
  500. CLAS6 Software

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)