Difference between revisions of "September 7, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 14: Line 14:
  
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip Off. Collimator On. With guys doing beam up and beam down.===
 +
 +
[[File:Thresh downstream beam collim 090711.png : 500px]]
 +
  
  
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip On. Collimator Off.===
 
===Pair-spectrometer threshold calibration with cosmic. Beam On.  Swip On. Collimator Off.===
 +
 +
 +
was not did it

Revision as of 16:51, 7 September 2011

go back


Wednesday Run Plan

  • Tune up beam
  • During this time, as much as possible tune up daq timing
  • Kicker magnet calibration with viewscreen
  • Pair spectrometer checkout/debugging
    This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open
     versus blocked, ...
  • Check detector rates with D2O. See if we can get a good time of flight spectrum.


Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.

File:Thresh downstream beam collim 090711.png : 500px


Pair-spectrometer threshold calibration with cosmic. Beam On. Swip On. Collimator Off.

was not did it