Difference between revisions of "September 4, 2011"

From New IAC Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
  
  
===Pair-spectrometer turn up===
+
===Pair-spectrometer threshold calibration with cosmic. Beam Off===
  
 
====Current Connection====
 
====Current Connection====
Line 8: Line 8:
 
*downstream: A6
 
*downstream: A6
  
====Threshold calibration with cosmic====
 
  
 
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]
 
[[File:Thresh upstream cosmic.png || 600px]] [[File:Thresh downstream cosmic.png || 600px]]
 
====Threshold calibration with beam on. Collimator blocked====
 
 
Need to be done
 

Latest revision as of 14:58, 7 September 2011

go back


Pair-spectrometer threshold calibration with cosmic. Beam Off

Current Connection

  • upstream: A5
  • downstream: A6


Thresh upstream cosmic.png Thresh downstream cosmic.png