September 20, 2011

From New IAC Wiki
Jump to navigation Jump to search

go back

summary what was been done

  • current 140 mA
  • pulse width 2 us
  • rep rate 180 Hz
  • E = 25 MeV


Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
2502 Up
90A
In Open In Yes In DU cylinder Test radiator in/out.

120664 pulses
R(bottom) = 0.0012 n/pulse -> ×180×60 = 12.9 n/min
R(upstream) = 0.0272 e+/pulse

2503 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

121258 pulses
R(bottom) = 0 n/pulse
R(upstream) = 0.00091 e+/pulse
About 97% of photons are coming from the radiator according to PS. Very Good

2504 Down
86A
In Open In Yes In DU cylinder Test radiator in/out.

R(bottom) = 0.00137 n/pulse -> ×180×60 = 14.8 n/min
R(upstream) = 0.0319 e+/pulse

2505 Down
86A
In Open In Yes Out DU cylinder Test radiator in/out.

122247 pulses
R(bottom) = 0 n/pulse
R(upstream) = 0.000908 e+/pulse
About 97% of photons are coming from the radiator according to PS. Very Good


Production runs

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 25 um Al Target Comments
2506 Up
90A
In Open In Yes In DU cylinder Long production run: 972556 pulses Operator said the beam is really jittery

R(bottom) = 0.0013 n/pulse -> ×180×60 = 14.0 n/min
R(upstream) = 0.0258 e+/pulse

2507 Down
86A
In Open In Yes In DU cylinder Long production run: 973769 pulses

R(bottom) = 0.001298 n/pulse -> ×180 pulses/second×60 seconds/minute = 14.0 n/min
R(upstream) = 0.0288 e+/pulse

2508 Down
86A
In Open In Yes Out DU cylinder Long production run: pulses

R(bottom) = 6.6E-6 n/pulse -> ×180×60 = 0.07 n/min
R(upstream) = 1.1E-3 e+/pulse

2509 Up
90A
In Open In Yes In DU cylinder Long production run: pulses

R(bottom) = 9.7E-4 n/pulse -> ×180×60 = 10.5 n/min
R(upstream) = 22.8E-3 e+/pulse


go up