Difference between revisions of "September 13, 2011"

From New IAC Wiki
Jump to navigation Jump to search
Line 13: Line 13:
 
|-
 
|-
 
|2385||Up 2 mm||In ||Open ||Out||DU plate  
 
|2385||Up 2 mm||In ||Open ||Out||DU plate  
|align="left"|Beam check-in run. Beam hardener off.
+
|align="left"|Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation.
 
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br>
 
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse <br>
 
R(beam 45 right) = 0/583758 = 0.0 n/pulse<br>
 
R(beam 45 right) = 0/583758 = 0.0 n/pulse<br>
Line 22: Line 22:
 
|2386||Up 2 mm||In ||Open ||Up 2 mm||DU plate  
 
|2386||Up 2 mm||In ||Open ||Up 2 mm||DU plate  
 
|align="left"|Beam check-in run. 1" of Al hardener in front of upstream radiator.
 
|align="left"|Beam check-in run. 1" of Al hardener in front of upstream radiator.
 +
R(beam 45 left) =  n/pulse <br>
 +
R(beam 45 right) =  n/pulse<br>
 +
R(beam down) = 90/79367 = 0.0011340 n/pulse<br>
 +
R(upstream) =  1058/57841 = 0.01829 e+/pulse<br>
 +
<span style="color:red">About 57% of photons are coming from the radiator according to PS. Bad</span><br>
 +
<span style="color:red">About 92% of neutrons are coming from the radiator according to n detector down. Good</span>
 +
|-
 +
|2387||Up 2 mm||In ||Open ||Up 2 mm||DU plate
 +
|align="left"|Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 left) =  n/pulse <br>
 
R(beam 45 right) =  n/pulse<br>
 
R(beam 45 right) =  n/pulse<br>

Revision as of 15:28, 13 September 2011

go back

summary what was been done

Run # Beam Dump magnet Collimator Radiator 10 um Al Target Comments
2385 Up 2 mm In Open Out DU plate Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation.

R(beam 45 left) = 6/173553 = 0.0000346 n/pulse
R(beam 45 right) = 0/583758 = 0.0 n/pulse
R(beam down) = 15/173553 = 0.0000864 n/pulse
R(upstream) = 1374/173553 = 0.00792 e+/pulse
Beam was lost

2386 Up 2 mm In Open Up 2 mm DU plate Beam check-in run. 1" of Al hardener in front of upstream radiator.

R(beam 45 left) = n/pulse
R(beam 45 right) = n/pulse
R(beam down) = 90/79367 = 0.0011340 n/pulse
R(upstream) = 1058/57841 = 0.01829 e+/pulse
About 57% of photons are coming from the radiator according to PS. Bad
About 92% of neutrons are coming from the radiator according to n detector down. Good

2387 Up 2 mm In Open Up 2 mm DU plate Beam check-in run. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation

R(beam 45 left) = n/pulse
R(beam 45 right) = n/pulse
R(beam down) = 90/79367 = 0.0011340 n/pulse
R(upstream) = 1058/57841 = 0.01829 e+/pulse
About 57% of photons are coming from the radiator according to PS. Bad
About 92% of neutrons are coming from the radiator according to n detector down. Good