Difference between revisions of "Saidk's To Do Tomorrow"

From New IAC Wiki
Jump to navigation Jump to search
 
(17 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 +
= 2012 =
 +
 +
 +
=Jun=
 +
 +
== 11/06/2012 ==
 +
*Check the alignment.
 +
*Put the beamline parts together.
 +
*Find DAQ hard-wares from Dr. McNalty's lab.
 +
*Ask Chad to make FC cooler.
 +
*Work on Table design.
 +
*Align YAG at the center of the 5-way cross.
 +
*Check the JAI camera trigger and trig it synchronously with LED.
 +
*Study the trigger of Prosilica camera.
 +
*Order W-targets -- waiting for quotation.
 +
*Order Prosilica camera cable -- Waiting for the confirmation.
 +
*Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
 +
 +
== May ==
 +
 +
===09/05/2012===
 +
 +
*Organize the wires.
 +
*Pulse the camera with pulser.
 +
*Find cable for pickup loop.
 +
*Pulse control new camera.
 +
*Target holder desiegn.
 +
*One bottle for all the gas parts.
 +
*Valve control (Automatic colse).
 +
 +
== Jan ==
 +
 +
 +
=== 26/01/2012 ===
 +
 +
*Ask Chad about Ion Pump Power Supply
 +
*Build Slit Control Display
 +
*IAC NaI detectors test
 +
*Dipole Mapping Data B-field Calculation
 +
 +
 +
=== 06/01/2012 ===
 +
 +
*Build Slit Control
 +
*V792 ADC Test
 +
*Dipole Mapping Data Input
 +
 
=2011=
 
=2011=
 +
==May==
 +
 +
5/16/11: 
 +
*Clamps for 6 quads on zero line port (look at red clamps)
 +
*FADC measuerments
 +
*wiring for camera
 +
*wiring for flags
 +
 +
=== 7 ===
 +
 +
Get ready the Flag for Energy Scan.
 +
 +
Do histograms for centering files.
 +
 +
Convert pixels to mm.
 +
 +
Get the distances between centered beam spot position to Max trans position.
 +
 +
Get the distances between centered beam spot position to Min deflection position.
 +
 +
Lab view GUI.
 +
 +
 
== Feb ==
 
== Feb ==
  
=== 6 ===
+
 
 +
=== 15 ===
 +
 
 +
Learning Running HRRL with Chad.
 +
 
 +
Labview control camera: do it.
 +
 
 +
Light for beam line focusing: do it.
 +
 
 +
Order coated lenses and Iris: Try with fewer lenses
 +
 
 +
Holder Diameter for calibration: measure it
 +
 
 +
Magnet Mapping: redo it, talk with Khalid?
 +
 
 +
Point Spread Function: Learn it [http://en.wikipedia.org/wiki/Point_spread_function]
 +
 
 +
Thesis Proposal : write it
 +
 
 +
=== 14 ===
 +
 
 +
Labview control camera: do it.
 +
 
 +
Light for beam line focusing: do it.
 +
 
 +
Order coated lenses and Iris: Try with fewer lenses
 +
 
 +
Holder Diameter for calibration: measure it
 +
 
 +
Magnet Mapping: redo it, talk with Khalid?
 +
 
 +
Point Spread Function: Learn it [http://en.wikipedia.org/wiki/Point_spread_function]
 +
 
 +
Thesis Proposal : write it
 +
 
 +
=== 10 ===
 +
 
 +
Light for beam line focusing: do it.
 +
 
 +
Order coated lenses and Iris: Try with fewer lenses
 +
 
 +
Holder Diameter for calibration: measure it
 +
 
 +
Magnet Mapping: redo it, talk with Khalid?
 +
 
 +
Point Spread Function: Learn it [http://en.wikipedia.org/wiki/Point_spread_function]
 +
 
 +
Thesis Proposal : write it
 +
 
 +
=== 8 ===
 +
 
 +
Camera, Gas for beam line: do it.
 +
 
 +
Order coated lenses and Iris: Try with fewer lenses
 +
 
 +
Holder Diameter for calibration: measure it
 +
 
 +
Magnet Mapping: redo it, talk with Khalid?
 +
 
 +
Point Spread Function: Learn it [http://en.wikipedia.org/wiki/Point_spread_function]
 +
 
 +
Thesis Proposal : write it
 +
 
 +
=== 7 ===
  
 
Holder for cage system to attach beam line: attach it.
 
Holder for cage system to attach beam line: attach it.

Latest revision as of 00:19, 12 June 2012

2012

Jun

11/06/2012

  • Check the alignment.
  • Put the beamline parts together.
  • Find DAQ hard-wares from Dr. McNalty's lab.
  • Ask Chad to make FC cooler.
  • Work on Table design.
  • Align YAG at the center of the 5-way cross.
  • Check the JAI camera trigger and trig it synchronously with LED.
  • Study the trigger of Prosilica camera.
  • Order W-targets -- waiting for quotation.
  • Order Prosilica camera cable -- Waiting for the confirmation.
  • Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)

May

09/05/2012

  • Organize the wires.
  • Pulse the camera with pulser.
  • Find cable for pickup loop.
  • Pulse control new camera.
  • Target holder desiegn.
  • One bottle for all the gas parts.
  • Valve control (Automatic colse).

Jan

26/01/2012

  • Ask Chad about Ion Pump Power Supply
  • Build Slit Control Display
  • IAC NaI detectors test
  • Dipole Mapping Data B-field Calculation


06/01/2012

  • Build Slit Control
  • V792 ADC Test
  • Dipole Mapping Data Input

2011

May

5/16/11:

  • Clamps for 6 quads on zero line port (look at red clamps)
  • FADC measuerments
  • wiring for camera
  • wiring for flags

7

Get ready the Flag for Energy Scan.

Do histograms for centering files.

Convert pixels to mm.

Get the distances between centered beam spot position to Max trans position.

Get the distances between centered beam spot position to Min deflection position.

Lab view GUI.


Feb

15

Learning Running HRRL with Chad.

Labview control camera: do it.

Light for beam line focusing: do it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: redo it, talk with Khalid?

Point Spread Function: Learn it [1]

Thesis Proposal : write it

14

Labview control camera: do it.

Light for beam line focusing: do it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: redo it, talk with Khalid?

Point Spread Function: Learn it [2]

Thesis Proposal : write it

10

Light for beam line focusing: do it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: redo it, talk with Khalid?

Point Spread Function: Learn it [3]

Thesis Proposal : write it

8

Camera, Gas for beam line: do it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: redo it, talk with Khalid?

Point Spread Function: Learn it [4]

Thesis Proposal : write it

7

Holder for cage system to attach beam line: attach it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: redo it?

Point Spread Function: Learn it [5]

Thesis Proposal : write it

6

Holder for cage system to attach beam line: make it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: do it.

Point Spread Function: Learn it [6]

Thesis Proposal : write it

4

Meet with Chris at 2 pm.

Holder for cage system to attach beam line: make it.

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: do it.

Point Spread Function: Learn it [7]

Thesis Proposal : write it

3

Order coated lenses and Iris: Try with fewer lenses

Holder Diameter for calibration: measure it

Magnet Mapping: do it.

Point Spread Function: Learn it [8]

Send corrected presentation to Dr. Kim

Thesis Proposal : write it

2

Point Spread Function: Learn it [9]

Send corrected presentation to Dr. Kim

Order coated lenses and Iris.

Magnet Mapping: do it.

Thesis Proposal : write it

1

Send corrected presentation to Dr. Kim

AccePhys Homework: do correction

Order coated lenses and Iris.

Magnet Mapping: do it.

Thesis Proposal : write it

Jan

29

Send corrected presentation to Dr. Kim

AccePhys Homework: do it

Emittance imaging: Post some picture of the laser spot image in the wiki.

Order coated lenses and Iris.

Magnet Mapping: do it.

Thesis Proposal : write it

28

Meet Chris at 2 pm.

Do the correction for the presentation (matrix).

AccePhys Homework: do it

Order coated lenses and Iris.

Emittance imaging: Post some picture of the laser spot image in the wiki.

Magnet Mapping: do it.

Thesis Proposal : write it

27

Do the correction for the presentation (matrix).

Order coated lenses and Iris.

Magnet Mapping: do it.

Emittance imaging: Post some picture of the laser spot image in the wiki.

AccePhys Homework: do it

Thesis Proposal : write it

26

Order coated lenses.

Magnet Mapping: do it.

(done) - Emittance fit: Find goodness of the fit. (need to know how to do integral in matlab)

Emittance imaging: Post some picture of the laser spot image in the wiki.

AccePhys Homework: do it

Thesis Proposal : write it

25

(done) - Acce Phys Fall term project presentation: correct unit.

(done) - Emittance fit: Make fonts bigger. Compare with the one I did.

Emittance fit: Find goodness of the fit.

Emittance imaging: Post some picture of the laser spot image in the wiki.

AccePhys Homework: do it

Thesis Proposal e: write it

24

Emittance fit: Make fonts bigger. Compare with the one I did.

Emittance imaging: Post some picture of the laser spot image in the wiki.

AccePhys Homework: do it

Thesis Proposal e: write it