Testing results

Wire Signal Testing

Signal testing performed to all S6's wires, the testing was simultaneously with the wire burning process. In general the signal is detected when the voltage on the sense wire was 1200V (or more), guard's 535V, and field's -750V.

The results are shown in the following table: