RUN 62

From New IAC Wiki
Revision as of 23:50, 13 January 2008 by Oborn (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

[math]P_B = 5.05 Torr[/math], trigger [math]T_1[/math] & [math]T_2[/math], time [determined] by [math]T_1[/math], NO beam