Difference between revisions of "Qweak R1 Proj Management"

From New IAC Wiki
Jump to navigation Jump to search
Line 11: Line 11:
 
==Commissioning shifts==
 
==Commissioning shifts==
  
These shifts wil take place during the Qweak comissioning phase
+
These shifts wil take place during the Qweak comissioning phase (5/10)
  
 
# Tracking shifts
 
# Tracking shifts

Revision as of 12:19, 29 July 2008

Project Leaders

Detector and Front End Electronics

Back End Electronics and Rotator

Man Power

JLAB tests

The hope is to test the R1 detector during the Summer of 2009 at JLAB with a setup identical to what will be used in the Hall. This means having the all cables in place (with the proper lengths) to test timing. We need CODA setup with a VME crate that has a V1495 in it for readout. We need the scintillator for triggering. Paul King won't be available until after Mid June.


Commissioning shifts

These shifts wil take place during the Qweak comissioning phase (5/10)

  1. Tracking shifts
  2. Writing the tracking document for shift takers.

Timeline

Date Milestone Description


Go Back