Difference between revisions of "Positrons"

From New IAC Wiki
Jump to navigation Jump to search
Line 127: Line 127:
 
|-
 
|-
 
| || pull cable for FCC signals and fan out to control room and DAQ room
 
| || pull cable for FCC signals and fan out to control room and DAQ room
 +
 +
 +
|-
 +
| || Check the alignment.
 +
|-
 +
| ||  Put the beamline parts together.
 +
|-
 +
| done || Find DAQ hard-wares from Dr. McNalty's lab.
 +
|-
 +
| done ||  Ask Chad to make FC cooler.
 +
|-
 +
| ||  Work on Table design.
 +
|-
 +
| ||  Align YAG at the center of the 5-way cross.
 +
|-
 +
| ||  Check the JAI camera trigger and trig it synchronously with LED.
 +
|-
 +
| ||  Study the trigger of Prosilica camera.
 +
|-
 +
| ||  Order W-targets -- waiting for quotation.
 +
|-
 +
| done ||  Order Prosilica camera cable -- Waiting for the confirmation.
 +
|-
 +
| ||  Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)
 
|}
 
|}
 +
 +
[[User_talk:foretony]]
 +
 +
 +
[[User:Setisadi]]

Revision as of 20:54, 14 June 2012

Proposals

Collaboration

Work

Designs

HRRL beam Line installation

Experiments

[PEPPo_Software]]

Simulations

Equipment

References

Calculations

Positron_Yield_Estimate

Neutron production

File:Huang NIMB229 2005.pdf

Task list

Priority task
1 Order target chamber
1 Order 8 tungsten targets, 2 mm thick
1 Order cooling lines for target chamber
1 Order 8 tungsten targets, 2 mm thick
2 Build box to hold target motor controls, pull cables
3 enclose HRRL cavity with 1/4" lead
check all connectors are in hand for target control
check camera pulse trigger synchronization
check beam line alignment , are energy slits centered, is 90degree line going straight through wall
bolt last flange to girder after last set of quads
tungsten target holder for rotating target
1 Ta or W re-conversion target for Flag 3
check flag 2 yag optics & setup, need way to switch internet between cameras so one computer can record images from each separately
two sets of steering magnets for 90 degree line
pull cable for FCC signals and fan out to control room and DAQ room


Check the alignment.
Put the beamline parts together.
done Find DAQ hard-wares from Dr. McNalty's lab.
done Ask Chad to make FC cooler.
Work on Table design.
Align YAG at the center of the 5-way cross.
Check the JAI camera trigger and trig it synchronously with LED.
Study the trigger of Prosilica camera.
Order W-targets -- waiting for quotation.
done Order Prosilica camera cable -- Waiting for the confirmation.
Install beam parts. (Ens, Flag2 Dipole2, Long beampipe, FC2, Flag2 gas.)