Difference between revisions of "PePPO 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 37: Line 37:
 
|Sadiq Setiniyaz ||  2+ weeks  
 
|Sadiq Setiniyaz ||  2+ weeks  
 
|-
 
|-
|Yujong Kim  ||  2 weeks (Available May 1 to June but not available May 20-25)
+
|Yujong Kim  ||  2 weeks (Available May 1 to June 30 but not available May 20-25)
 
|-
 
|-
 
|}
 
|}

Revision as of 17:56, 16 February 2012

Run Configuration

Positrons may be In May

The main electron beam current needs to be limited to 10 nA using a beam line cavity.

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Feb. 2, 2012 Readiness Review
May , 2012 Readiness Review


Collaborator available
Phil Cole 1 week (not available July 1-July 8)
Dan Dale 1 week (not available July 1-July 8)
Tony Forest 2 weeks (not available July 1-July 8)
Dustin McNulty 1 week
Sadiq Setiniyaz 2+ weeks
Yujong Kim 2 weeks (Available May 1 to June 30 but not available May 20-25)


2012AnnihCountrRateEstimate

Positrons