Difference between revisions of "PePPO 2012Run"

From New IAC Wiki
Jump to navigation Jump to search
Line 4: Line 4:
 
Positrons may be In May
 
Positrons may be In May
  
The main electron beam current is restricted to 10 nA
+
The main electron beam current is restricted to 10 nA by
  
 
Currently max energy is 7.8 MeV.
 
Currently max energy is 7.8 MeV.

Revision as of 16:09, 23 November 2011

Run Configuration

Positrons may be In May

The main electron beam current is restricted to 10 nA by

Currently max energy is 7.8 MeV.

Choosing 6.3 MeV incident electron energy because that is the most stable.

[math]\sigma[/math] = 0.5 mm on the Tungsten target (T1)

Date Task/Item
Jan 22, 2012 Readiness Review


Positrons