Difference between revisions of "PAS Thermalizing Box Design"

From New IAC Wiki
Jump to navigation Jump to search
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
=3D Models=
+
='''3D Models'''=
  
 
For all models:
 
For all models:
Line 10: Line 10:
  
  
==7/6/21==
+
=='''7/6/21'''==
  
 
[[File:PAS_CH_Pb_tunnel_v13.png|300px|thumb|none|Render of top down view of preliminary experimental setup]]
 
[[File:PAS_CH_Pb_tunnel_v13.png|300px|thumb|none|Render of top down view of preliminary experimental setup]]
Line 17: Line 17:
 
This design is preliminary and subject to change. No BorAl shielding has been included.
 
This design is preliminary and subject to change. No BorAl shielding has been included.
  
==7/12/21==
+
=='''7/12/21'''==
  
 
[[File:CH PAS Pb tunnel v21 Gd Converter.png|300px]]
 
[[File:CH PAS Pb tunnel v21 Gd Converter.png|300px]]
Line 23: Line 23:
 
[[File:CH PAS Pb Tunnel v21.png|300px]]
 
[[File:CH PAS Pb Tunnel v21.png|300px]]
  
==7/14/21==
+
=='''7/14/21'''==
  
 
'''Poly Bricks for Setup'''
 
'''Poly Bricks for Setup'''
  
===Poly Base===
+
==='''Poly Base'''===
  
 
* 4X (4" x 2" x 6")
 
* 4X (4" x 2" x 6")
Line 33: Line 33:
 
* 2X (4" x 2" x 7")
 
* 2X (4" x 2" x 7")
  
===Poly Outside Wall===
+
==='''Poly Outside Wall'''===
  
 
* 1X (4" x 2" x 7")
 
* 1X (4" x 2" x 7")
Line 41: Line 41:
 
* 2X (4" x 2" x 8")
 
* 2X (4" x 2" x 8")
  
===Poly Inside Wall===
+
==='''Poly Inside Wall'''===
  
 
* 1X (4" x 2" x 3")
 
* 1X (4" x 2" x 3")
Line 57: Line 57:
 
* 2X (2" x 2" x 6")
 
* 2X (2" x 2" x 6")
  
=Lead=
+
='''Lead'''=
  
* 4" x 1" x 8" (x12)
+
50 lead bricks
** The lead is layered beneath, around the outside, and on top of the thermalizing box
 
  
The lead base is 4 bricks
+
* (49) 4" x 1" x 8"
  
The outside is covered by 5 bricks (on 1" x 4" side (upright))
+
* (1) 4" x 2" x 8"
 +
 
 +
='''BorAl'''=
 +
 
 +
Needs to be calculated based off of new setup
 +
 
 +
='''First Built Design'''=
 +
 
 +
 
 +
 
 +
{| class="wikitable"
 +
|+ Feasibility setup exterior
 +
|-
 +
| [[File:PAS Feasibility 1.jpg|300px|thumb|center|Looking down the detector tunnel towards the converter]] || [[File:PAS Feasibility 2.jpg|300px|thumb|center|Overview of the setup with detector tunnel extending to the right and the source tunnel extending towards the back of the image]]
 +
|-
 +
| [[File:PAS Feasibility 3.jpg|300px|thumb|center|The backside of the source tunnel with regular poly exposed]] || [[File:PAS Feasibility 4.jpg|300px|thumb|center|Top view of the source tunnel with poly present as a stability measure for lead bricks stacked on end]]
 +
|}
 +
 
 +
 
 +
{| class="wikitable"
 +
|+ Feasibility setup interior
 +
|-
 +
| [[File:Pb_tunnel_As_Built_7-19-2021.png|300px|thumb|center|Top down view of rendering of experimental setup]] || [[File:Pb_tunnel_As_Built_7-19-2021_2.png|300px|thumb|center|Interior walls removed to show poly and lead structures inside. Detector mounting hardware included to show rough position of detector in experimental setup]]
 +
|}
  
The top is covered by 3 bricks
 
  
=BorAl=
 
  
  

Latest revision as of 16:38, 19 July 2021

3D Models

For all models:

  • Red - Lead brick
  • White - Regular poly
  • Green - Borated Poly


7/6/21

Render of top down view of preliminary experimental setup


This design is preliminary and subject to change. No BorAl shielding has been included.

7/12/21

CH PAS Pb tunnel v21 Gd Converter.png

CH PAS Pb Tunnel v21.png

7/14/21

Poly Bricks for Setup

Poly Base

  • 4X (4" x 2" x 6")
  • 2X (4" x 2" x 7")

Poly Outside Wall

  • 1X (4" x 2" x 7")
  • 1X (4" x 2" x 6")
  • 2X (4" x 2" x 8")

Poly Inside Wall

  • 1X (4" x 2" x 3")
  • 1X (4" x 2" x 8")
  • 2X (4" x 2" x 6")

Poly Top

  • 2X (4" x 2" x 7")
  • 3X (4" x 2" x 6")
  • 2X (2" x 2" x 6")

Lead

50 lead bricks

  • (49) 4" x 1" x 8"
  • (1) 4" x 2" x 8"

BorAl

Needs to be calculated based off of new setup

First Built Design

Feasibility setup exterior
Looking down the detector tunnel towards the converter
Overview of the setup with detector tunnel extending to the right and the source tunnel extending towards the back of the image
The backside of the source tunnel with regular poly exposed
Top view of the source tunnel with poly present as a stability measure for lead bricks stacked on end


Feasibility setup interior
Top down view of rendering of experimental setup
Interior walls removed to show poly and lead structures inside. Detector mounting hardware included to show rough position of detector in experimental setup




PAS_Experimental_Setup