Difference between revisions of "PAS Thermalizing Box Design"

From New IAC Wiki
Jump to navigation Jump to search
Line 76: Line 76:
 
|+ Feasibility setup
 
|+ Feasibility setup
 
|-
 
|-
| [[File:PAS Feasibility 1.jpg|300px|thumb|center|]] || [[File:PAS Feasibility 2.jpg|300px|thumb|center|]]
+
| [[File:PAS Feasibility 1.jpg|300px|thumb|center|Looking down the detector tunnel towards the converter]] || [[File:PAS Feasibility 2.jpg|300px|thumb|center|Overview of the setup with detector tunnel extending to the right and the source tunnel extending towards the back of the image]]
 
|-
 
|-
| [[File:PAS Feasibility 3.jpg|300px|thumb|center|]] || [[File:PAS Feasibility 4.jpg|300px|thumb|center|]]
+
| [[File:PAS Feasibility 3.jpg|300px|thumb|center|The backside of the source tunnel with regular poly exposed]] || [[File:PAS Feasibility 4.jpg|300px|thumb|center|Top view of the source tunnel with poly present as a stability measure for lead bricks stacked on end]]
 
|}
 
|}
  

Revision as of 16:30, 19 July 2021

3D Models

For all models:

  • Red - Lead brick
  • White - Regular poly
  • Green - Borated Poly


7/6/21

Render of top down view of preliminary experimental setup


This design is preliminary and subject to change. No BorAl shielding has been included.

7/12/21

CH PAS Pb tunnel v21 Gd Converter.png

CH PAS Pb Tunnel v21.png

7/14/21

Poly Bricks for Setup

Poly Base

  • 4X (4" x 2" x 6")
  • 2X (4" x 2" x 7")

Poly Outside Wall

  • 1X (4" x 2" x 7")
  • 1X (4" x 2" x 6")
  • 2X (4" x 2" x 8")

Poly Inside Wall

  • 1X (4" x 2" x 3")
  • 1X (4" x 2" x 8")
  • 2X (4" x 2" x 6")

Poly Top

  • 2X (4" x 2" x 7")
  • 3X (4" x 2" x 6")
  • 2X (2" x 2" x 6")

Lead

50 lead bricks

  • (49) 4" x 1" x 8"
  • (1) 4" x 2" x 8"

BorAl

Needs to be calculated based off of new setup

First Built Design

Feasibility setup
Looking down the detector tunnel towards the converter
Overview of the setup with detector tunnel extending to the right and the source tunnel extending towards the back of the image
The backside of the source tunnel with regular poly exposed
Top view of the source tunnel with poly present as a stability measure for lead bricks stacked on end





PAS_Experimental_Setup