Difference between revisions of "PAS Thermalizing Box Design"

From New IAC Wiki
Jump to navigation Jump to search
Line 70: Line 70:
  
 
='''First Built Design'''=
 
='''First Built Design'''=
 +
 +
[[File:PAS Feasibility 1.jpg|300px|thumb|center|]]
 +
 +
 +
 +
  
  

Revision as of 16:26, 19 July 2021

3D Models

For all models:

  • Red - Lead brick
  • White - Regular poly
  • Green - Borated Poly


7/6/21

Render of top down view of preliminary experimental setup


This design is preliminary and subject to change. No BorAl shielding has been included.

7/12/21

CH PAS Pb tunnel v21 Gd Converter.png

CH PAS Pb Tunnel v21.png

7/14/21

Poly Bricks for Setup

Poly Base

  • 4X (4" x 2" x 6")
  • 2X (4" x 2" x 7")

Poly Outside Wall

  • 1X (4" x 2" x 7")
  • 1X (4" x 2" x 6")
  • 2X (4" x 2" x 8")

Poly Inside Wall

  • 1X (4" x 2" x 3")
  • 1X (4" x 2" x 8")
  • 2X (4" x 2" x 6")

Poly Top

  • 2X (4" x 2" x 7")
  • 3X (4" x 2" x 6")
  • 2X (2" x 2" x 6")

Lead

50 lead bricks

  • (49) 4" x 1" x 8"
  • (1) 4" x 2" x 8"

BorAl

Needs to be calculated based off of new setup

First Built Design

PAS Feasibility 1.jpg






PAS_Experimental_Setup