PAS Feasibility Preliminary Runs

From New IAC Wiki
Revision as of 15:35, 17 July 2021 by Harpconn (talk | contribs)
Jump to navigation Jump to search

This experimental setup does not contain BorAl


General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
    • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
    • Move the source to different locations along the source tunnel and plot the different distances and count rates





PAS Feasibility Study Runs