Difference between revisions of "PAA Selenium/Soil Experiments"

From New IAC Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
|5/23/17 ||170047 || Soil + Se (50%) || || [[LB_May_2017_Irradiation_Day#50%_Se_Soil_Mix]]  
 
|5/23/17 ||170047 || Soil + Se (50%) || || [[LB_May_2017_Irradiation_Day#50%_Se_Soil_Mix]]  
 
|-
 
|-
| 5/23/17||170048 ||Soil + Se (10%) ||  ||[[LB_May_2017_Irradiation_Day#10.25_Se_Soil_Mix]] ||
+
| 5/23/17||170048 ||Soil + Se (10%) ||  || [[Se170048]]  [[LB_May_2017_Irradiation_Day#10.25_Se_Soil_Mix]] ||
 
|-
 
|-
 
|5/23/17||170049 || Soil + Se (1%) ||  ||[[LB_May_2017_Irradiation_Day#1%_Se_Soil_Mix]]
 
|5/23/17||170049 || Soil + Se (1%) ||  ||[[LB_May_2017_Irradiation_Day#1%_Se_Soil_Mix]]

Revision as of 18:32, 7 September 2017

Selenium Sample Analysis

Date Of Activation Inventory # Sample Description Irradiation Conditions Photon Spec History
5/23/17 170047 Soil + Se (50%) LB_May_2017_Irradiation_Day#50%_Se_Soil_Mix
5/23/17 170048 Soil + Se (10%) Se170048 LB_May_2017_Irradiation_Day#10.25_Se_Soil_Mix
5/23/17 170049 Soil + Se (1%) LB_May_2017_Irradiation_Day#1%_Se_Soil_Mix
5/23/17 170050 Soil + Se (0.1%) LB_May_2017_Irradiation_Day#0.1%_Se_Soil_Mix
5/24/17 170055 Fresh Sage + Se (0.1%) LB_May_2017_Irradiation_Day#5/24/17
5/24/17 170056 Fresh Sage + Se (50%) LB_May_2017_Irradiation_Day#5/24/17
5/25/17 170061 Sage Ash + Se (0.1%,Blowtorch Method) LB_May_2017_Irradiation_Day#5/25/17
5/25/17 170062 Soil + Se (0.5%) LB_May_2017_Irradiation_Day#5/25/17
5/25/17 170063 Sage Ash + Se (10%, Oven Method) LB_May_2017_Irradiation_Day#Runlist_2
5/26/17 170067 Soil + Se (0.05%) LB_May_2017_Irradiation_Day#5/26/17
5/26/17 170068 Ash + Se (0.04%, Oven Method) LB_May_2017_Irradiation_Day#5/26/17
2/13/17 (Re-irradiated on 4/18/17) 170010 50% Se Soil Mix LB Feb 2017 Runlist#Feb 14 2017, LB March 2017 Runlist#April 2017 Runlist
2/13/17 (Re-irradiated on 4/18/17) 170011 10% Se Soil Mix LB Feb 2017 Runlist#Feb 14 2017 Runlist, LB March 2017 Runlist#April 2017 Runlist

Runs

Jan 2016

SeRun_01-11-16

March 2016

SeRun_03-07-16

October 2016

Preliminary Information Before Irradiation of Soil Sample

Using Detector D at the IAC, I had to get a count on the unirradiated soil sample that was collected. Here are the GPS coordinates ****

Here is the spectrum produced:

Soil No Irr 10 21 16 logplot.png

The details of the calibration along with the constants found from a linear fit of temperature vs. voltage can be found in the page below.

Calibration 10-21-16 Det D Calibration 10-28-16 Det A

Soil Se Overlay.png Background Se Overlay.png

Feb 2017

SeRun_02-13-17

LB Feb 2017 Runlist

Target Prep February 2017

LB Feb 2017 Energy Efficiency Calculations


LB IAC Radiator Specs

LB Rotating Sample Holder