NEUPRFP 2009

From New IAC Wiki
Revision as of 22:36, 24 February 2009 by Oborn (talk | contribs)
Jump to navigation Jump to search

A PDF version of the RFP is given below

Media:NEUP_RFP_2008.pdf


Proposal Due date
March 16,2009

Go/NoGo requirements

  1. Commitment to reporting
  2. If DOE Lab Work and safety Health program
  3. Export Control
  4. Standard Research Subcontract
  5. Quality Assurance if non-academic partner
  6. commitment to prepare additional contracts

Proposal Outline

Title:

Technical Work Scope and Mission Relevance

Proposed scope description and Scientific Merit

Research Plan Tasks to accomplish scope

Milestones and Deliverables

12 months after: acquire instrumentation 24 months after: commission beamline 36 months after: report on measurements with application assessment



R&D resources and Capabilities

Timeline

year

1: establish beamline 2: 3:


Roles of Participants and Team Qualifications

Participant A = D.Dale = Manager Photofission physics Participant B = V. Starovoitova = Data analysis expert Participant C = T. Forest = DAQ, beam line design Participant D = P. Cole = beamline instrumentation, expert complainer


Students = 2 PhD theses + 2 MS theses, 2 undergrad training

Work Scope Challenges and expected innovations

Documentation procedures

Quality Assurance

Budget form

Proposal Graphs

The time of flight measured by detector A. The unhatched histogram represents the flight time observed when a D2O target is used while the hatched histogram is observed when using the H2O target
overall apparatus
brem target
experimental cell closeup. Need to fix the e+/e- orbits to look the same. One of the particles will remain in the B-field while the other escapes.