Difference between revisions of "NEUPRFP 2009"

From New IAC Wiki
Jump to navigation Jump to search
Line 42: Line 42:
  
 
==Timeline==
 
==Timeline==
year
 
  
1: establish beamline
+
year 1: establish beamline
2:
 
3:
 
  
 +
year 2:
 +
 +
year 3:
 +
 +
(D.Dale)
  
 
==Roles of Participants and Team Qualifications (15% or 2 pages)==
 
==Roles of Participants and Team Qualifications (15% or 2 pages)==

Revision as of 23:56, 24 February 2009

A PDF version of the RFP is given below

Media:NEUP_RFP_2008.pdf


Proposal Due date
March 16,2009

Go/NoGo requirements

  1. Commitment to reporting
  2. If DOE Lab Work and safety Health program
  3. Export Control
  4. Standard Research Subcontract
  5. Quality Assurance if non-academic partner
  6. commitment to prepare additional contracts

Proposal Outline

Title:

Technical Work Scope and Mission Relevance (20% or 3 pages)

Proposed scope description and Scientific Merit (20% or 3 pages)

Research Plan Tasks to accomplish scope (35% or 5 pages)

1. establish and commission beamline for polarized photons 2. proof in principle asymm measurement 3. applications: variable targets

Milestones and Deliverables

12 months after: acquire beamline components (vacuum pipe for beam dump, beam dump magnet, exit window/pair converter, radiator, 4 PMTs+ bases, octal discriminators, 4-fold logic unit)

24 months after: commission beamline; begin measurements

36 months after: report on measurements with application assessment

R&D resources and Capabilities (10% or 1.5 pages)

HRRL description (with specs and picture) counting room (with picture)

Timeline

year 1: establish beamline

year 2:

year 3:

(D.Dale)

Roles of Participants and Team Qualifications (15% or 2 pages)

Participant A = D.Dale = Manager Photofission physics

Participant B = V. Starovoitova = Data analysis expert

Participant C = T. Forest = DAQ, beam line design

Participant D = P. Cole = beamline instrumentation, expert complainer


Students = 2 PhD theses + 2 MS theses, 2 undergrad training

Work Scope Challenges and expected innovations

Documentation procedures

Quality Assurance

Budget form

Proposal Graphs

The time of flight measured by detector A. The unhatched histogram represents the flight time observed when a D2O target is used while the hatched histogram is observed when using the H2O target
overall apparatus
brem target
experimental cell closeup. Need to fix the e+/e- orbits to look the same. One of the particles will remain in the B-field while the other escapes.