Difference between revisions of "MiniPrototype CosmicRuns"

From New IAC Wiki
Jump to navigation Jump to search
Line 15: Line 15:
  
 
==Runs==
 
==Runs==
 +
 +
Drift Chamber is off
  
 
Run 182:  Ran with coincidence module in "OR" mode so if either paddle triggered the ADC was read out
 
Run 182:  Ran with coincidence module in "OR" mode so if either paddle triggered the ADC was read out

Revision as of 00:35, 26 December 2007

Cosmic Coincidences

setup

Setup a cosmic coincidence experiment with two crossed scintillators that have the proto-type drift chambers sandwhiched between them.

Built 4 100 ns long delay cables. 2 for the PMTs and one for sense wire 7 on each of the drift chambers.


The top PMT is in channel 7 of the QDC and channel 16 of the scaler.

The Bottom PMT is on channel 8 of the QDC and channel 7 of the scaler.

Coincidence counts are recorded in channel 2 of the scaler.

Runs

Drift Chamber is off

Run 182: Ran with coincidence module in "OR" mode so if either paddle triggered the ADC was read out

Run 183: Switched coincidence module to "AND" mode and ran overnight.

12/23/07

Run 204: Scope was plugged into DC output (split signal)

12/24/07

Run 206: Unplugged scope and started this run


Go back