Installed 32 channel CAEN V792 ADC last week. Testing module this week.

Need Translator NIM module for Metallica output!

Would like to get4 PIN connector for Preamp power supply input


Use 90/10 Ar CO2 mixture run at 1500, -800, 800

Drift Chamber prototypes were constructed to evaluate drift chamber designs for CLAS12.
MiniPrototypeWirePattern.jpg

Run Plan for Mini-prototype Performance Measurements

Description of General Operation

Chamber Ionization Gas

Our initial plan will be to use [math]ArCO_2[/math] (75/25) flowing though the chamber at a flow rate high enough to exchange the volume once a day.

high Voltage supply

A CAEN 4 channel high voltage supply (N470) will be used to supply HV to the drift chambers. The supply is capable of monitoring currents at the microAmp([math]\mu[/math]A) level and voltages at the Volt (V) level.

An e-mail from Mac has suggested we run the chamber such that the voltage difference between the sense and field wire be about 2490 Volts. He suggests sense:field:guard voltages of 1660:-830:830 respectively as a starting point and recommends keeping the ratio 2:-1:1 in order to have equal gain among the sense wires.

Signal Processing

Each sense wire is capacitively coupled to a preamplifier by a 221 pF capacitor. A schematic of the preamplifier (CP01H1- Hybrid) is shown below.

File:MiniProtoDC PreamplifierCircuit.pdf
File:MiniProtoDC BFT25.pdf
File:MiniProtoDC BFT92.pdf

a signal translator board was designed to power the 7 preamplifiers for each sense wire. A negative voltage regulator (Fairchild part # LM7905CT File:MiniProtoDC VoltageReg LM790CT.pdf) is used to regulate the +5 voltage voltage input thereby "floating" the ground of the circuit. The layout of this board is shown below.

File:MiniProtoDC SignalTranslatorBoard.pdf


Eelectronics.jpg
The 7 sense wire signals from the Drift Chambers signal translator board will be processed through several NIM based modules. One can expect to amplify the sense wire output from a factor of 10 to 30 times. We will use our Ortec amplifier to amplify the sense wire output by a factor of 10. A descriminator from Lecroy with a threshold range from 30 mV up to 1.5 Volts will be used to create a stop pulse for TDCs that are started by scintillators which detect either an electron, during tests at the IAC, or cosmic rays, during tests at the LDS (see below). Hall B has loaned the ISU group a TDC module for the drift chamber studies. Pulse height studies may also be done using an ADC. The DAQ system to manage the signal processing electronics is described below.

DAQ System

The DAQ system is described here

Cosmic tests

Apparatus

Place chamber between two plastic scintillator paddles to check signals. We will use the large area 7 cm by 50 cm paddles with the Russian PMTs operating at 1300 V and threshold > 150 mV to select energetic cosmic rays. We will arrange the paddles so that they are perpendicular to one another. From above, the paddles will have 7 cm by 7 cm overlap. This will allow for testing the chamber along its length.

scope pulses

We will insert oscilloscope pictures of the Drift Chamber output signals we observe.

Planned tests

We will use the scintillator paddles to detect cosmic rays and perform the following tests:


1. Efficiency along length of chamber with overlapping array of scint. paddles optimized for normal incidence.

2. Efficiency as a function of discriminator threshold, i.e. what is the required energy of the cosmic ray.

3. Efficiency as a function of angle. Count rates will decrease so we will have to determine the best overlapping configuration of the paddles.

4. Noise Rates. Generate a delayed OR gate from the two cosmic ray detectors in order to measure noise in the baby chamber. Record pulse heights on all wires + scintillators.

The above tests will give us a baseline for the drift chamber and are not designed to evaluate the efficiency as a function of distance from the endplate due to the large angular divergence of the incident cosmic rays and the limited counting statistics. We will use a finely collimated secondary electron beam at the IAC in order to make precision measurements of the efficiency as a function the ionization event distance from the endplate.

Electron test facility

IAC 25 MeV electron accelerator

The Idaho Accelerator Center (IAC) operates a 25 MeV Linac capable of delivering instantaneous electron currents of 80 mA/pulse. Pulse widths range from 80 ns to 2 [math]\mu[/math]s and repetition rates from single shot to 1 kHz. Drift Chamber testing will use this accelerator to create a secondary electron beam as described below.

secondary electron beam setup

We will need to bring the electron beam from Accelerator lab #1 to the experimental testing cell labeled as "target room" . IAC 25MeV FloorPlan w ExpCell.gif Floor Plan of IAC.

An evacuated beam pipe from the current exit window of the LINAC to the collimator entrance at the wall will be built to accomplish this. Magnetic elements are already in place to stear electrons into the "target room". The pipe will have aluminum windows at either end to allow for passage of the electron beam. Phil will be responsible for the design and safety concerns of implementing the pipe. The wall is 6' thick, which is 4' of packed earth sandwiched between 1' of concrete on either side. Upon reaching the wall the electron beam will travel through the hole defined by the collimator aperture. The electron beam will have to travel through a distance of 8' of air as it goes into the experimental test cell. The radiation length of air at STP is over 300 m, so this ought not be a problem. We can place an insert into the collimator on the test cell side to define the electron beam if need be.

We will use Dan's idea of elastic scattering. See: http://www.physics.isu.edu/~cole/IAC/DC_prototype/Detector-Test.pdf

The idea: the beam is incident upon a pencil lead target and the electrons will elastically scatter off the carbon atoms. The prototype will be positioned perpendicular to the incident electron beam so that only the elastically scattered electrons will pass through the chamber. We will place 5 mm by 5 mm scintillators on either side of the chamber. This scintillator arrangement allows for triggering and defining the beam. The paddles will be fixed and the prototype will be on a moveable platform that will be controlled by a stepper motor. This will allow us to measure the sense wire efficiency along the length of the wire and, in particular, the efficiency in close proximity to the feedthroughs.


Description of how beam size will be measured or why it isn't needed.

stepper device

I think the device below can be used to move the minichamber across the backscattered electron beam. The device is over 3 feet in length and has a platform with is 6" x 6". We should configure the platform so it can hold both chambers "back-to-back" in order to test both chambers at the same time. The first chamber has four 3/8" bolts on the bottom for mounting but the 2nd one has yet to have anything.

MiniChamber Clas12 fullview.jpg
MiniChamber CLAS12 Length.jpg
MiniChamber CLAS12 Platform Base.jpg

Drift Chamber efficiency measurements

Efficiency -vs- Distance

The secondary electron beam will be moved towards the drift chamber endplate while the efficiency is measured. The results of our tests will be placed below.

Distance Feedthrough Efficiency
(mm) plastic metal
2
4
6
8
10
12
14

Metal feedthrough

Radiation Tests on Gas

Place chamber in main hall and direct high current electrons through the prototype.

1. Do not flush gas. How long does it take before the efficiency detiorates due to radiation damage of the gas.

2. Flush gas at variable rates to determine what the minimum flush rate is to ascertain proper stable efficiency.

Measurements in LDS

HV connections and Readout

The High Voltage lines are shown below along with labels for the three voltages. I will try to install SHV connectors as well as a plastic safety shield to keep a student's finger away from the HV.
DC Prototype HV posts.jpg

After Installing SHV BNC connectors
DC Prototype SHV BNC.jpg


Preamp power connector inputs
DC Prototype Preamp Voltage.jpg
Output connector. Preamp output signals are differential.
DC Prototype Preamp Outputs.jpg

Inspecting Detector Signals

The sense wire drift chamber output was monitored to search for ionization events from cosmic rays. A scintillator paddle was place on top of the detector in order to create a scope trigger which would indicate the passage of a charged particle.

MiniDCproto CosmicsUsingLargeScint.jpg MiniDCproto TestApparatus1.jpg

The link below describes scope measurements taken in the LDS

MiniDC_Signals_10-0-07

Preamp Output

The preamplifiers described above are capacitively connected to the sense wires using the custom built signal translator board. I applied 5.7 to 6.0 Volts to the board based on observations using a test pulses input to the signal board. Under operating conditions a RC like feedback noise with an MHz frequency and 50 mV amplitude was observed as the voltage to the preamp board is increased from about 2.8 volts to 5.5 volts. The link below documents our observations.

MiniDC_PreampOutput_10_10_07

The next step will be to setup the DAQ system to perform to measure the sense wire outputs. I will use the cosmic telescope to generate a trigger pulse when cosmic rays pass through the drift chamber. When we install the system up at the IAC the beam RF will be used as the trigger.

Determining Min operating HV

The output of all seven sense wires was measured using a scope in order to identify the high voltage settings to be used when operating the drift chamber.

MINIDC_MinVoltageStudy

Post Amp NIM Module

The DC preamp output is sent to a translator board in a NIM bin module. The translator board takes the differential preamplifier output as input and outputs a single ended pulse through the front panel lemo connectors. A 100 mV negative test pulse was injected into the preamplifier board and sent to all preamp channels. The output of the translator board was looked at on a scope and compared to the preamp input pulse. The image below shows the input pulse to the drift chamber preamp circuit via the lemo input on the top trace and the translator output on the bottom trace. All signals were terminated in 50 Ohms on the scope.

Plastika TranslaterBoardOutput 11-15-07.jpg

Metalica_TestPulseoutput_12-20-07
Metalica_TestPulseoutput_12-21-07

CAEN V792 ADC calibration

[math]100 fC/channel = 6.255 \times 10^{5} e^{-}/channel[/math] MiniPrototype_CAEN_V792_Calibration

Cosmic runs

MiniPrototype_CosmicRuns

IAC Runs

IAC_1-4-08

IAC_1-7-08

IAC_1-8-08

1-8-08_PrelimResults

Analysis

Programs

On the DAQ machine in the subdirectory

/home/daq/CODA/CODAreader/UsingROOTnEVIO/evio2root


there are 2 programs

evio2nt will create a ROOT tree using the CODA data file usage:

evio2nt -f/data1/rxxx.dat or for data taken on Jan 08, 2008

evio2nt -f/data1/BabyChamberEfficiency_1-08_1550SenseWires/rxxx.dat

this output a file called "rxxx" which you need to renamen to "rxxx.root" and then you can look at it.

A few commands

root[] new TBrowser();
root[] ntuple->Draw("ADC1")
root[] ntuple->Draw("ADC1","ADC1<4096")
root[] ntuple->Draw("ADC1:ADC2")

UV laser tests

Media:CLAS_NOTE_95-22.pdf

CLAS 12 Tracking workshop 2/21/08

Design review in May 2008 with Hall D

[math]\theta \pm 1[/math] mrad

Acceptance: 50% of 2[math]\pi[/math] at 5 degree scattering angle.

30[math] \mu m[/math] sense wire

92/08 ArCO2