May 31st 2018 - 25b 0 degree port

From New IAC Wiki
Revision as of 21:08, 4 June 2018 by Harpconn (talk | contribs)
Jump to navigation Jump to search

Linac Run Plan April 2018, Dr. McNulty

In chronological order

Pulse Width: 500ns

Beam Current: 50mA

Distance from end of beam pipe: 50cm

Shot # Number of Pulses Number of OSLs Dose/pulse (Rad) Expected Dose/pulse (Rad)
1 6 1 128.017
2 6 1 132.544

Shot 3: First array of 16 OSLs (Electrons)

Shot 4: First array of 17 OSLs (Electrons)



Beam retuned at this point



Shot # Number of Pulses Number of OSLs Dose/pulse (Rad) Expected Dose/pulse (Rad)
5 6 1 239.292
6 2 1 234.141
7 4 1 210.719
8 5 1 212.598
9 3 1 215.545

Average Dose/Pulse: 222.459 Rad

Shots 5-9

Shot 10: Second array of 17 OSLs (Electrons)

Center OSL read 199.121 Rad/Pulse

Averaging with Shots 5 to 9: 218.569 Rad



Thesis