LB April Efficiency Calculations

From New IAC Wiki
Revision as of 18:08, 26 April 2017 by Brenleyt (talk | contribs) (→‎Actual Activity)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The source information can be found on the page below.

LB March 2017 Runlist

Theoretical Activities

Ba-133, 9.821 uCi on April 7, 2015, half life 10.51 years, 32.9% for 80.9979 keV line,activity in April 18, 2017 =8.589 uCi

= [math]\left (0.329 \right )\left ( 8.589 \times 10^{-6} \mbox{Ci} \right) \left (\frac{ (3.7 \times 10^{10} \mbox{Hz}}{\mbox{Ci}} \right)= 107840.607 Hz [/math] for the 80.9979 line

Actual Activity

Run Source Energy (keV) Position Expected Rate (Hz) ROOT Window HpGe Rate (Hz) Detector B Efficiency (%)
DetB_Eff_Ba133_14in.mpa Ba-133 80.9979 14 in from DetB 107840.607 [79:86] 236.103+\-1.068 0.22