Difference between revisions of "June, 21, Cosmic background BC408 on top of HpGe"

From New IAC Wiki
Jump to navigation Jump to search
 
Line 5: Line 5:
 
jun21_2007_background002 was stopped at 11:12 am on June, 22<br>
 
jun21_2007_background002 was stopped at 11:12 am on June, 22<br>
  
Lead bricks with thickness of 10.4 cm were used as a shielding for HpGe detector on the both sides, front layer was 20.4 cm and bottom one 5 cm. The was not lead on top of HpGe detector<br>
+
Lead bricks with thickness of 10.4 cm were used as a shielding for HpGe detector on the both sides, front layer was 20.4 cm and bottom one 5 cm. There was not lead on top of HpGe detector<br>
  
  

Latest revision as of 01:10, 24 June 2007

Cosmic ray test of BC408 and HpGe coincidence

5:00 pm started overnight coincidence run file name jun21_2007_background002

jun21_2007_background002 was stopped at 11:12 am on June, 22

Lead bricks with thickness of 10.4 cm were used as a shielding for HpGe detector on the both sides, front layer was 20.4 cm and bottom one 5 cm. There was not lead on top of HpGe detector


1. The ungated cosmic ray spectrum obtained from HpGe detector

Example74.jpg

2.Cosmic ray spectrum detected in fast plastic scintillator BC408

Example21.jpg


3.Spectrum of time intervals between signals coming from germanium detector and fast plastic scintillator

Example73.jpg

4. The cosmic ray spectrum obtained from HpGe detector in coincidence with fast plastic scintillator BC408

Example72.jpg