Problem unloading Stringing Fixture

The Stringing Fixture, when standing on the pallet, was between 3-5 inches too high. We laid it down on its side to get it in the dock door.

C12 SF Problem2.jpgC12 SF Problem1.jpgC12 SF Problem3.jpg


2011C12 SF Soltn1.jpg2011C12 SF Soltn2.jpg

We will need to use the crane to lay the next fixture on it side or pack it so it is 3" lower in height (don't put it on a pallete but make custum skids for moving it with the pallet jack).

Pallet #1 Drift Chamber and Strong back

Pallet #2 Stringing Fixture

Pallet 3 Loading Platform

Pallet #4 Magnet

Pallet #5 Loading platform

Pallet #6 & 7 Scissor lifts

CLAS12_R1_Progress_Reports