Difference between revisions of "IAC positron beamline"

From New IAC Wiki
Jump to navigation Jump to search
Line 4: Line 4:
 
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg | 400 px]]
 
[[Image:IAC_25MeV_90DegreeBend_11-08-07.jpg | 400 px]]
  
The next picture was taken upstream of this and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..
+
The next picture was taken upstream of the 90 degree bend and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..
  
 
[[Image:IAC_25MeV_Dipole1_11-08-07.jpg | 400 px]]
 
[[Image:IAC_25MeV_Dipole1_11-08-07.jpg | 400 px]]

Revision as of 18:37, 9 November 2007

This picture shows you the current 90 degree bend into the experimental hall. Quad 1 and Quad 2 are shown and then the 2nd Dipole magnet (labeled Bending Magnet 2A a.k.a. Dipole 2) begins after Quad 1 and Quad 2. Dipole 2 is following by another Quad doublet and then a Dipole (Dipole 3) and then a final quad doublet before going through the wall into the experimental cell.


IAC 25MeV 90DegreeBend 11-08-07.jpg

The next picture was taken upstream of the 90 degree bend and shows Dipole 1 which is usually off unless we want to bend beam right into the accelerator hall instead of going straight to Quad 1 and Quad 2..

IAC 25MeV Dipole1 11-08-07.jpg

Label on side of Dipole 1

IAC 25MeV Dipole1 Label 11-08-07.jpg

Label on side of Dipole 2

IAC 25MeV Dipole2 Label 11-08-07.jpg

The Quad doublets in the current beam line have the following label.

IAC 25MeV QuadDoublet Label 11-08-07.jpg


We also have Quad triplet which take up less space than the doubles.