Difference between revisions of "IAC 2-29-08"

From New IAC Wiki
Jump to navigation Jump to search
Line 26: Line 26:
  
 
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall.  A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser.  A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle.  A coincidence is required between the two scintillators.
 
A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall.  A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser.  A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle.  A coincidence is required between the two scintillators.
 +
 +
= Runs=

Revision as of 15:23, 29 February 2008

Leap Day run

DC setup

This time the Sense wire HV is set to 1500 to start

90/10 ArCo2

HV settings
Wire Volts current ([math]\mu[/math]A)
Sense 1500
Field -750
Guard 750

DC preamp at 5.6 Volts


Go Back

Beam Line Configuration

A 1/4 inch diameter collimater is placed in the experimental cell just after a Helium bag inserted in the wall. A 2 cm thick scintillator is place over the beam downstream side of the collimator aligned using a laser. A 1 kG magnet placed after the drift chambers deflects charged particles onto a large scintillator paddle. A coincidence is required between the two scintillators.

Runs