IAC 1-8-08

From New IAC Wiki
Revision as of 17:52, 8 January 2008 by Oborn (talk | contribs)
Jump to navigation Jump to search

90/10 ArCo2

HV settings
Cable # Volts Desc
223A10 Metalica Sense Wire #4
223A11 Plsstica Sense Wire #4
223A12 1105 PMT Scintillator
223A13 1110 Middle Scintillator
223A14 1090 Last Scintillator (Veto)
223A15 V260 Scaler Input
223A16 V260 Scaler Input


Drift Chamber HV

HV settings
Cable # Volts Current (ma)
Sense 1456
Field 729
Guard 731

ADC Channel ID

ADC Channel IDs
Channel Desc
0 Metalica wire 1
1 Plastica wire 1
14 Front Scint
15 Back Scint
16 Front Scint


Run 297:

First measurement with ADCs. Zero position (beam hitting trumpet).

Run 298:

Move Drift chamber 1 cm (-20,000 on axis 2, 0.4 left arrow on GUI) away from trumpet.

Go Back