HRRLrun 3-22-26-2010

From New IAC Wiki
Revision as of 00:25, 20 March 2010 by Oborn (talk | contribs) (→‎3/19/10)
Jump to navigation Jump to search

HRRL run on March 22-26 2010

Preliminary setup

3/17/10

Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table.

Install collimation

3/18/10

Install all detectors and associated electronics (power supplies, cabling, gas lines,...)

3/19/10

install DAQ system and associated readout electronics.

Check channels in histograms


Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs

TDC start: Accelerator RF pulse generator. TDC stop: 2 DC, 1 GEM trigout, 4 PMTs

ADC: all FC channels from Accelerator ribbon cable. ADC gate: Create timing gate using scope when accelerator

V1495: Trigger pulse from coincidence logic above

3/22/10

Final day for completing system checks

3/23/10

1pm - 5pm: Tune beam for low and high current

3/24/10

Positron spectrometer run plan

Detector tracking run plan