HRRL Positrons Jul 2012 Runs Setup

From New IAC Wiki
Jump to navigation Jump to search

ADC inputs

Detector Left -> CH6

Detector Right -> CH5

Beam left Scintillator (between Q9 and Q10)-> CH9

Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.

Battery -> CH13.

Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.