Difference between revisions of "HRRL CHIPS Logbook"

From New IAC Wiki
Jump to navigation Jump to search
Line 6: Line 6:
  
 
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in [http://wiki.iac.isu.edu/index.php/Beamline_design_%28G._Stancari%29 Stancari's design].
 
2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in [http://wiki.iac.isu.edu/index.php/Beamline_design_%28G._Stancari%29 Stancari's design].
 +
 +
3.) Doug will send a paper with gamma measurements made that may be comparable to the HRLL.
 +
 +
4.) Compose a downtime schedule for the HRRL
 +
 +
5.) Try to get Yag crystals from JLab for the flags and see if there are any beam profile monitors available.
  
  
 
Go back to [[Positrons]]
 
Go back to [[Positrons]]

Revision as of 17:14, 29 October 2009

10/29/09

Met with IAC director Doug Wells and Khalid Chouffani at the IAC to determine the next steps on the positron project funded by DOE.

1.) Ask Mark Balzer to submit a report on the radiation dose measurements taken.

2.) Once report is digested, determine the HRRL shielding needed to move the accelerator to the wall as shown in Stancari's design.

3.) Doug will send a paper with gamma measurements made that may be comparable to the HRLL.

4.) Compose a downtime schedule for the HRRL

5.) Try to get Yag crystals from JLab for the flags and see if there are any beam profile monitors available.