Default HRRL running Conditions

[math]I_{peak}[/math] Pulse Width Rep Rate Energy
8 mA 25 ns 1 Hz 3 MeV


run plan

Date Task
4/11/09 Install Motion Sliders
4/12/09 Install DAQ and Drift chambers
4/13/09 Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak)
4/14/09 Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 8 mA peak), Do Plateau measurements and test readout
4/15/09 Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM
4/16/09 Run HRRL from 2 pm til 5 pm, efficiency tests
4/17/09 Run HRRL from 9 am til 5 pm finish detector tracking studies

4/13/09

Electron Dose tests

Shutter In

0.1 mrad/hr outside HRRL experimental door.

2.7 mrad/hr in the end of HRRL experimental hallway.

Shutter Out

0.1 mrad/hr in Dr. Forest office.

Sintillator tests

2 aluminum blocks are in front of Long BLue Scintillator plugged into the cable patch pannel 223A2

Small scintillator is in 223A1

GEM noise

GEM in Accelerator room

GEM in HRRL exp cell

Go Back Qweak