HRRL 4-13-09

From New IAC Wiki
Revision as of 15:35, 1 April 2009 by Oborn (talk | contribs) (New page: = Default HRRL running Conditions= = run plan= {| border="3" cellpadding="20" cellspacing="0" | Date || Task |- |4/11/09 || Install Motion Sliders |- |4/12/09 || Install DAQ and Drift c...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Default HRRL running Conditions

run plan

Date Task
4/11/09 Install Motion Sliders
4/12/09 Install DAQ and Drift chambers
4/13/09 Install Aluminum brick shutter and interlock with HRRL, test beam transport: Run HRRL accelerator from 3pm til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak)
4/14/09 Run HRRL from 9 am til 5 pm (25 ns pulse width, 3 MeV electrons, 1 Hz rep rate, 3 mA peak), Do Plateau measurements and test readout
4/15/09 Run HRRL from 2 pm til 5 pm, position studies using Drift chamber and GEM
4/16/09 Run HRRL from 2 pm til 5 pm, efficiency tests
4/17/09 Run HRRL from 9 am til 5 pm finish detector tracking studies

Go Back Qweak