Difference between revisions of "Emittance Test"

From New IAC Wiki
Jump to navigation Jump to search
Line 112: Line 112:
 
  2. Once first step finished, then rotate theodolite horizontally to down stream. Turn it up and down, if up and down angles are not equal, adjust the stand till they are equal.
 
  2. Once first step finished, then rotate theodolite horizontally to down stream. Turn it up and down, if up and down angles are not equal, adjust the stand till they are equal.
  
==B. Centering the Quad Magnet with Theodolite==
+
===B. Centering the Quad Magnet with Theodolite===
 
   
 
   
 
  ===Vertical Centering===
 
  ===Vertical Centering===

Revision as of 22:54, 22 July 2010

Design

Emittance Desien.png

New deisign: We changed to use just one magnet.


Emittance Desien new.png


HRRL had steer magnets on itself. We don't need external steer magnets. But Dr. Chouffani said that we might need them after quads, if the quads are not on axis. He will think about it.


File:Emittance Test Optim File.txt


File:HRRL Emittance.pdf

Faraday Cup

Farady Cap For HRRL Positorns 1.jpg

Farady Cap For HRRL Positorns 2.jpg

Farady Cap For HRRL Positorns 3.jpg

Farady Cap For HRRL Positorns 4.jpg

Farady Cap For HRRL Positorns 5.jpg

Farady Cap For HRRL Positorns 6.jpg

Farady Cap For HRRL Positorns 7.jpg

Farady Cap For HRRL Positorns 8.jpg


Old Beam Line

HRRL Old BeamLine 1.jpg

HRRL Old BeamLine 2.jpg

HRRL Old BeamLine 3.jpg

HRRL Old BeamLine 4.jpg

HRRL Old BeamLine 5.jpg

HRRL Old BeamLine 6.jpg

Beam Line Parts

Beam Line Parts HRRL Positorns 1.jpg

Beam Line Parts HRRL Positorns 2.jpg

Beam Line Parts HRRL Positorns 3.jpg

Beam Line Parts HRRL Positorns 4.jpg

Beam Line Parts HRRL Positorns 5.jpg

Beam Line Parts HRRL Positorns 6.jpg

Beam Line Parts HRRL Positorns 7.jpg

Beam Line Parts HRRL Positorns 8.jpg


Beam Line Parts HRRL Positorns 9.jpg

Beam Line Parts HRRL Positorns 10.jpg

Beam Line Parts HRRL Positorns 11.jpg

Beam Line Parts HRRL Positorns 12.jpg


Constructed Beam Line for Emittance Test

Vacuum pressure on the beam line is less than [math] 10^{-8} [/math] torr (on 2010-July-7th).

Constructed Beam Line for Emittance Test 1.jpg


Constructed Beam Line for Emittance Test 2.jpg


Constructed Beam Line for Emittance Test 3.jpg



Leveling Survey

Downstream of the beam up by 2.6 mm.

Constructed Beam Line for Emittance Test Leveling Survey.jpg



How to do Leveling Survey and Alignment with Theodolite on e- Beam Line

A. Leveling Beam Pipe

1. Put the theodolite as high as the center of the beam line at upstream. Turn theodolite up and down. If the up angle is equal to down angle from the center of the pipe, theodolite is exactly as high as beam pipe. If not, adjust theodolite, until up and down angles are equal.

2. Once first step finished, then rotate theodolite horizontally to down stream. Turn it up and down, if up and down angles are not equal, adjust the stand till they are equal.

B. Centering the Quad Magnet with Theodolite

===Vertical Centering===
1. Finish the step 1 in A.
2. Then turn up the theodolite from the upper edge of the pipe to the magnet hole, call this angle upper angle.
 Do the same at lower part, call it lower angle. If the this two angles are not equal adjust the stand till they are equal. 
 



Go back Positrons