Double Peak Analysis

From New IAC Wiki
Revision as of 16:42, 18 April 2011 by Swanjase (talk | contribs)
Jump to navigation Jump to search

go back

The lead in front of the neutron detectors was removed. Run 1930 shows the results with no physics target, and 1931 has a D2O target.

File:Calibration run1931-.jpg

go back